Works matching IS 10946136 AND DT 2007 AND VI 10 AND IP 3
Results: 6
A classification of predictive-reactive project scheduling procedures.
- Published in:
- Journal of Scheduling, 2007, v. 10, n. 3, p. 195, doi. 10.1007/s10951-007-0011-2
- By:
- Publication type:
- Article
Introduction to the special issue: project scheduling under uncertainty.
- Published in:
- Journal of Scheduling, 2007, v. 10, n. 3, p. 151, doi. 10.1007/s10951-007-0009-9
- By:
- Publication type:
- Article
Scheduling for stability in single-machine production systems.
- Published in:
- Journal of Scheduling, 2007, v. 10, n. 3, p. 223, doi. 10.1007/s10951-007-0014-z
- By:
- Publication type:
- Article
A two-stage stochastic programming approach for project planning with uncertain activity durations.
- Published in:
- Journal of Scheduling, 2007, v. 10, n. 3, p. 167, doi. 10.1007/s10951-007-0008-x
- By:
- Publication type:
- Article
When it is worthwhile to work with the stochastic RCPSP?
- Published in:
- Journal of Scheduling, 2007, v. 10, n. 3, p. 153
- By:
- Publication type:
- Article
A robust approach for the single machine scheduling problem.
- Published in:
- Journal of Scheduling, 2007, v. 10, n. 3, p. 209, doi. 10.1007/s10951-007-0010-3
- By:
- Publication type:
- Article