Found: 8
Select item for more details and to access through your institution.
How small are shifts required in optimal preemptive schedules?
- Published in:
- Journal of Scheduling, 2015, v. 18, n. 2, p. 155, doi. 10.1007/s10951-013-0355-8
- By:
- Publication type:
- Article
Two-agent single-machine scheduling with release dates and preemption to minimize the maximum lateness.
- Published in:
- Journal of Scheduling, 2015, v. 18, n. 2, p. 147, doi. 10.1007/s10951-013-0360-y
- By:
- Publication type:
- Article
Split scheduling with uniform setup times.
- Published in:
- Journal of Scheduling, 2015, v. 18, n. 2, p. 119, doi. 10.1007/s10951-014-0370-4
- By:
- Publication type:
- Article
On-line preemptive machine scheduling with $$\ell _p$$ norm on two uniform machines.
- Published in:
- Journal of Scheduling, 2015, v. 18, n. 2, p. 185, doi. 10.1007/s10951-014-0387-8
- By:
- Publication type:
- Article
Solving multi-activity multi-day shift scheduling problems with a hybrid heuristic.
- Published in:
- Journal of Scheduling, 2015, v. 18, n. 2, p. 207, doi. 10.1007/s10951-014-0383-z
- By:
- Publication type:
- Article
Scheduling multi-colour print jobs with sequence-dependent setup times.
- Published in:
- Journal of Scheduling, 2015, v. 18, n. 2, p. 131, doi. 10.1007/s10951-014-0400-2
- By:
- Publication type:
- Article
Integration of scheduling and advanced process control in semiconductor manufacturing: review and outlook.
- Published in:
- Journal of Scheduling, 2015, v. 18, n. 2, p. 195, doi. 10.1007/s10951-014-0381-1
- By:
- Publication type:
- Article
Solving the selective multi-category parallel-servicing problem.
- Published in:
- Journal of Scheduling, 2015, v. 18, n. 2, p. 165, doi. 10.1007/s10951-013-0353-x
- By:
- Publication type:
- Article