Works matching IS 10939687 AND DT 2010 AND VI 25 AND IP 4
Results: 5
Toward a Trust-Based Construction Management.
- Published in:
- Computer-Aided Civil & Infrastructure Engineering, 2010, v. 25, n. 4, p. 253, doi. 10.1111/j.1467-8667.2009.00628.x
- By:
- Publication type:
- Article
Fuzzy Monte Carlo Simulation and Risk Assessment in Construction.
- Published in:
- Computer-Aided Civil & Infrastructure Engineering, 2010, v. 25, n. 4, p. 238, doi. 10.1111/j.1467-8667.2009.00632.x
- By:
- Publication type:
- Article
Optimal Performance-Based Building Facility Management.
- Published in:
- Computer-Aided Civil & Infrastructure Engineering, 2010, v. 25, n. 4, p. 269, doi. 10.1111/j.1467-8667.2009.00633.x
- By:
- Publication type:
- Article
Reliability-Based Optimization Models for Scheduling Pavement Rehabilitation.
- Published in:
- Computer-Aided Civil & Infrastructure Engineering, 2010, v. 25, n. 4, p. 227, doi. 10.1111/j.1467-8667.2009.00636.x
- By:
- Publication type:
- Article
Ontologies to Support RFID-Based Link between Virtual Models and Construction Components.
- Published in:
- Computer-Aided Civil & Infrastructure Engineering, 2010, v. 25, n. 4, p. 285, doi. 10.1111/j.1467-8667.2009.00638.x
- By:
- Publication type:
- Article