Works matching IS 10724761 AND DT 2024 AND VI 31 AND IP 2
Results: 13
CONTEXT-TREE APPROACH FOR MONITORING THE MULTI-WAY CONTINGENCY TABLES-BASED PROCESSES WITH DEPENDENCE BETWEEN NEIGHBORHOOD CELLS.
- Published in:
- International Journal of Industrial Engineering, 2024, v. 31, n. 2, p. 374, doi. 10.23055/ijietap.2023.31.2.8171
- By:
- Publication type:
- Article
A NETWORK-BASED METHOD FOR CONSTRUCTING A TECHNOLOGY ROADMAP.
- Published in:
- International Journal of Industrial Engineering, 2024, v. 31, n. 2, p. 357, doi. 10.23055/ijietap.2024.31.2.9655
- By:
- Publication type:
- Article
EVALUATING THE WORK DESIGN READINESS FOR INDUSTRY 4.0 BASED ON PERSONAL CHARACTERISTICS OF PRODUCTION WORKERS.
- Published in:
- International Journal of Industrial Engineering, 2024, v. 31, n. 2, p. 340, doi. 10.23055/ijietap.2024.31.2.9563
- By:
- Publication type:
- Article
MULTIPLE-OBJECTIVE SCHEDULING FOR BATCH PROCESS SYSTEMS USING STOCHASTIC UTILITY EVALUATION.
- Published in:
- International Journal of Industrial Engineering, 2024, v. 31, n. 2, p. 413, doi. 10.23055/ijietap.2024.31.2.9889
- By:
- Publication type:
- Article
AN EXPLORATORY OBSERVATION INTO THE STATUS OF COLLABORATIVE MANUFACTURING FOR TOOL AND DIE DEVELOPMENT IN MALAYSIA.
- Published in:
- International Journal of Industrial Engineering, 2024, v. 31, n. 2, p. 398, doi. 10.23055/ijietap.2024.31.2.9775
- By:
- Publication type:
- Article
DUAL-OBJECTIVE ORDER SEQUENCING IN A PUT-WALL-BASED PICKING STATION.
- Published in:
- International Journal of Industrial Engineering, 2024, v. 31, n. 2, p. 385, doi. 10.23055/ijietap.2024.31.2.9757
- By:
- Publication type:
- Article
PROJECT SELECTION REVISITED: CUSTOMIZED TYPE-2 FUZZY ORESTE APPROACH FOR PROJECT PRIORITIZATION.
- Published in:
- International Journal of Industrial Engineering, 2024, v. 31, n. 2, p. 317, doi. 10.23055/ijietap.2024.31.2.9853
- By:
- Publication type:
- Article
A NEW BI-OBJECTIVE MODEL TO OPTIMIZE SOLID TRANSPORTATION UNDER UNCERTAINTY TO FACILITATE CATASTROPHE VICTIMS: A CASE STUDY.
- Published in:
- International Journal of Industrial Engineering, 2024, v. 31, n. 2, p. 298, doi. 10.23055/ijietap.2024.31.2.9765
- By:
- Publication type:
- Article
INTEGRATED ARTIFICIAL IMMUNE SYSTEM AND TAGUCHI APPROACH FOR PRODUCTION SCHEDULING IN THE GARMENT INDUSTRY.
- Published in:
- International Journal of Industrial Engineering, 2024, v. 31, n. 2, p. 278, doi. 10.23055/ijietap.2024.31.2.9747
- By:
- Publication type:
- Article
WORKER SCHEDULING OF BANBURY PROCESS USING GOAL PROGRAMMING: A TIRE MANUFACTURING COMPANY CASE STUDY.
- Published in:
- International Journal of Industrial Engineering, 2024, v. 31, n. 2, p. 258, doi. 10.23055/ijietap.2024.31.2.9717
- By:
- Publication type:
- Article
SYSTEM DYNAMICS ANALYSIS FOR IMPACT OF CLOUD-BASED INFORMATION-SHARING ON SUPPLY CHAIN PERFORMANCE.
- Published in:
- International Journal of Industrial Engineering, 2024, v. 31, n. 2, p. 234, doi. 10.23055/ijietap.2024.31.2.9693
- By:
- Publication type:
- Article
MODELING OF CROSS-NETWORK COLLABORATION SUPPLY CHAIN AND SOLUTION VIA REINFORCEMENT LEARNING-BASED EVOLUTIONARY ALGORITHM.
- Published in:
- International Journal of Industrial Engineering, 2024, v. 31, n. 2, p. 204, doi. 10.23055/ijietap.2024.31.2.9523
- By:
- Publication type:
- Article
THE IMPACT OF A VENDOR-MANAGED INVENTORY POLICY ON THE CASH-BULLWHIP EFFECT.
- Published in:
- International Journal of Industrial Engineering, 2024, v. 31, n. 2, p. 184, doi. 10.23055/ijietap.2024.31.2.9825
- By:
- Publication type:
- Article