Works matching IS 10724761 AND DT 2012 AND VI 19 AND IP 6
Results: 3
A QUANTITATIVE PERFORMANCE EVALUATION MODEL BASED ON A JOB SATISFACTION-PERFORMANCE MATRIX AND APPLICATION IN A MANUFACTURING COMPANY.
- Published in:
- International Journal of Industrial Engineering, 2012, v. 19, n. 6, p. 264
- By:
- Publication type:
- Article
A MULTI-HIERARCHY GREY RELATIONAL ANALYSIS MODEL FOR NATURAL GAS PIPELINE OPERATION SCHEMES COMPREHENSIVE EVALUATION.
- Published in:
- International Journal of Industrial Engineering, 2012, v. 19, n. 6, p. 241
- By:
- Publication type:
- Article
OPTIMAL FLEET SIZE, DELIVERY ROUTES, AND WORKFORCE ASSIGNMENTS FOR THE VEHICLE ROUTING PROBLEM WITH MANUAL MATERIALS HANDLING.
- Published in:
- International Journal of Industrial Engineering, 2012, v. 19, n. 6, p. 252
- By:
- Publication type:
- Article