Works matching IS 10668527 AND DT 2025 AND VI 44 AND IP 1
Results: 17
Comprehensive risk assessment approach for storage tank facilities against hazards including fire, explosion, and earthquake.
- Published in:
- Process Safety Progress, 2025, v. 44, n. 1, p. 70, doi. 10.1002/prs.12666
- By:
- Publication type:
- Article
Info for Authors.
- Published in:
- Process Safety Progress, 2025, v. 44, n. 1, p. 1, doi. 10.1002/prs.12675
- Publication type:
- Article
Measuring the safety climate in China's chemical industry and investigating the influencing factors: A case study of a large enterprise.
- Published in:
- Process Safety Progress, 2025, v. 44, n. 1, p. 122, doi. 10.1002/prs.12668
- By:
- Publication type:
- Article
Inherently safer?
- Published in:
- Process Safety Progress, 2025, v. 44, n. 1, p. 3, doi. 10.1002/prs.12665
- By:
- Publication type:
- Article
Toward sustainable process safety management 4.0 versus process safety management.
- Published in:
- Process Safety Progress, 2025, v. 44, n. 1, p. 6, doi. 10.1002/prs.12664
- By:
- Publication type:
- Article
A detailed study on heat of reaction and heat rate determination of nitrobenzene hydrogenation to aniline reaction using power compensation reaction calorimeter.
- Published in:
- Process Safety Progress, 2025, v. 44, n. 1, p. 132, doi. 10.1002/prs.12663
- By:
- Publication type:
- Article
Analysis of a third‐party action incident in a gas pipeline: A case study of the Cuiabá Lateral Pipeline in Brazil.
- Published in:
- Process Safety Progress, 2025, v. 44, n. 1, p. 114, doi. 10.1002/prs.12662
- By:
- Publication type:
- Article
Exploring key safety terminology through simulation: Definitions and practical insights.
- Published in:
- Process Safety Progress, 2025, v. 44, n. 1, p. 49, doi. 10.1002/prs.12660
- By:
- Publication type:
- Article
Propose a practical plan for the identification of Safety‐Critical Equipment.
- Published in:
- Process Safety Progress, 2025, v. 44, n. 1, p. 39, doi. 10.1002/prs.12659
- By:
- Publication type:
- Article
Managing the risk of continued operation with out‐of‐service safety instrumented system devices.
- Published in:
- Process Safety Progress, 2025, v. 44, n. 1, p. 94, doi. 10.1002/prs.12658
- By:
- Publication type:
- Article
Process safety in bioenergy with carbon capture and storage systems (BECCS).
- Published in:
- Process Safety Progress, 2025, v. 44, n. 1, p. 31, doi. 10.1002/prs.12657
- By:
- Publication type:
- Article
What to do with your maintenance records for protection layers?
- Published in:
- Process Safety Progress, 2025, v. 44, n. 1, p. 86, doi. 10.1002/prs.12656
- By:
- Publication type:
- Article
The meaning of "should".
- Published in:
- Process Safety Progress, 2025, v. 44, n. 1, p. 15, doi. 10.1002/prs.12655
- By:
- Publication type:
- Article
Root causes analysis for improved containment integrity in LPG storage: A case study.
- Published in:
- Process Safety Progress, 2025, v. 44, n. 1, p. 104, doi. 10.1002/prs.12654
- By:
- Publication type:
- Article
Safety assessment of wellhead devices on the offshore platform in a shallow gas blowout accident.
- Published in:
- Process Safety Progress, 2025, v. 44, n. 1, p. 57, doi. 10.1002/prs.12653
- By:
- Publication type:
- Article
Considerations for the safe handling and processing of unstable materials.
- Published in:
- Process Safety Progress, 2025, v. 44, n. 1, p. 22, doi. 10.1002/prs.12652
- By:
- Publication type:
- Article
Issue Information.
- Published in:
- Process Safety Progress, 2025, v. 44, n. 1, p. 1, doi. 10.1002/prs.12620
- Publication type:
- Article