Works matching IS 10066047 AND DT 2024 AND VI 44 AND IP 3


Results: 29
    1

    新能源大基地风光储容量协调优化配置.

    Published in:
    Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2024, v. 44, n. 3, p. 1, doi. 10.16081/j.epae.202309017
    By:
    • 李明轩;
    • 范 越;
    • 汪 莹;
    • 王 炜;
    • 牛拴保;
    • 魏 韡
    Publication type:
    Article
    2
    3
    4
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    25

    构网型直驱风电机组间控制相互作用研究.

    Published in:
    Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2024, v. 44, n. 3, p. 82, doi. 10.16081/j.epae.202312013
    By:
    • 王玉坤;
    • 张慕婕;
    • 李 壮;
    • 穆 清;
    • 王东泽;
    • 孙海顺;
    • 潘晓杰;
    • 邵德军
    Publication type:
    Article
    26
    27
    28
    29