Works matching IS 10066047 AND DT 2020 AND VI 40 AND IP 5
Results: 29
基于鸽群优化算法的支持向量机在电力 需求总量预测中的应用.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 173, doi. 10.16081/j.epae.202004016
- By:
- Publication type:
- Article
电力系统多区域分布式状态估计方法.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 165, doi. 10.16081/j.epae.202004019
- By:
- Publication type:
- Article
基于WGAN 图片去模糊的绝缘子目标检测.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 188, doi. 10.16081/j.epae.202003020
- By:
- Publication type:
- Article
高海拔地区特高压杆塔的合成电场和 电位转移电流实测研究.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 220, doi. 10.16081/j.epae.202005035
- By:
- Publication type:
- Article
大规模风电参与一次调频下基于机组快速 启动能力的日内滚动调度.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 121, doi. 10.16081/j.epae.202003002
- By:
- Publication type:
- Article
园区级-设备级电压暂降协同治理优化方案 及其投融资策略.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 157, doi. 10.16081/j.epae.202005013
- By:
- Publication type:
- Article
热网特性对弃风消纳效果的影响研究.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 24, doi. 10.16081/j.epae.202004011
- By:
- Publication type:
- Article
交流饱和铁芯型故障限流器的现状与发展.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 209, doi. 10.16081/j.epae.202005008
- By:
- Publication type:
- Article
基于波形特征的地铁牵引整流器二极管开路故障诊断方法.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 195, doi. 10.16081/j.epae.202005003
- By:
- Publication type:
- Article
基于单斜坡法的光电复合海缆温度、应变快速测量方法.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 202, doi. 10.16081/j.epae.202005005
- By:
- Publication type:
- Article
配电网故障区段定位的互补松弛约束新模型与算法.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 129, doi. 10.16081/j.epae.202004008
- By:
- Publication type:
- Article
基于混合半云模型的风速-功率曲线建模方法.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 106, doi. 10.16081/j.epae.202005004
- By:
- Publication type:
- Article
MMC-HVDC 系统换流器桥臂短路故障暂态特性分析.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 180, doi. 10.16081/j.epae.202004026
- By:
- Publication type:
- Article
大型光伏储能电站与同步发电机励磁的非线性协调控制策略.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 92, doi. 10.16081/j.epae.202003028
- By:
- Publication type:
- Article
基于台风场景模拟的配电网架空线路薄弱环节辨识方法.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 150, doi. 10.16081/j.epae.202004021
- By:
- Publication type:
- Article
基于可变误差多面体算法的储能融合电锅炉 提升风电消纳控制技术.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 47, doi. 10.16081/j.epae.202004022
- By:
- Publication type:
- Article
基于多元线性回归的单相电表相别判断方法.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 144, doi. 10.16081/j.epae.202003023
- By:
- Publication type:
- Article
基于配电网分区的分布式混合储能优化方法.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 137, doi. 10.16081/j.epae.202004009
- By:
- Publication type:
- Article
光伏逆变器短路电流3 次谐波及其对保护的影响分析.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 99, doi. 10.16081/j.epae.202004025
- By:
- Publication type:
- Article
考虑用车紧急度的电动汽车充放电模糊逻辑控制策略.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 62, doi. 10.16081/j.epae.202004018
- By:
- Publication type:
- Article
风电接入下核电参与电力系统调峰的协调优化模型.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 31, doi. 10.16081/j.epae.202005015
- By:
- Publication type:
- Article
适用于含新能源逆变电源网络的全时域 短路电流计算方法.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 113, doi. 10.16081/j.epae.202003012
- By:
- Publication type:
- Article
采用分群优化的电动汽车与电网互动调度策略.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 77, doi. 10.16081/j.epae.202004010
- By:
- Publication type:
- Article
基于主从博弈理论的能源互联配电网 多能互补协调故障恢复方法.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 38, doi. 10.16081/j.epae.202004020
- By:
- Publication type:
- Article
考虑电动汽车充放电全程功率变化率和 用户舒适度的V2H 调度策略.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 70, doi. 10.16081/j.epae.202005001
- By:
- Publication type:
- Article
考虑光伏出力不确定性的园区配电网日前运行计划.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 85, doi. 10.16081/j.epae.202003004
- By:
- Publication type:
- Article
计及高渗透率光伏的配电网广义负荷一体化等值建模.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 1, doi. 10.16081/j.epae.202003007
- By:
- Publication type:
- Article
计及订单热力分布和充换电节点成本差异的 电动网约车充换电路径最优规划方法
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 54, doi. 10.16081/j.epae.202005029
- By:
- Publication type:
- Article
气网动态潮流下多能源网与能量枢纽的联合调度.
- Published in:
- Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 5, p. 16, doi. 10.16081/j.epae.202004006
- By:
- Publication type:
- Article