Works matching IS 10066047 AND DT 2020 AND VI 40 AND IP 12


Results: 30
    1
    2
    3

    计及 CVaR 的负荷聚合商双重市场投标策略.

    Published in:
    Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 12, p. 153, doi. 10.16081/j.epae.202010021
    By:
    • 张晶晶;
    • 蒋峰;
    • 吴红斌;
    • 齐先军;
    • 李淑杨;
    • 杨世海;
    • 李志新
    Publication type:
    Article
    4
    5
    6
    7
    8
    9
    10
    11

    考虑预测误差的风火协调滚动调度.

    Published in:
    Electric Power Automation Equipment / Dianli Zidonghua Shebei, 2020, v. 40, n. 12, p. 88, doi. 10.16081/j.epae.202011015
    By:
    • 李志伟;
    • 赵书强;
    • 董凌
    Publication type:
    Article
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    25
    26
    27
    28
    29
    30