Works matching IS 10014578 AND DT 2019 AND VI 47 AND IP 9


Results: 21
    1
    2
    3
    4

    高压分注井全过程带压作业管柱.

    Published in:
    China Petroleum Machinery, 2019, v. 47, n. 9, p. 118, doi. 10.16082/j.cnki.issn.1001-4578.2019.09.018
    By:
    • 肖国华;
    • 黄晓蒙;
    • 姜卫中;
    • 吴双亮
    Publication type:
    Article
    5
    6
    7
    8
    9
    10
    11

    9 000 m智能钻机关键技术.

    Published in:
    China Petroleum Machinery, 2019, v. 47, n. 9, p. 57, doi. 10.16082/j.cnki.issn.1001-4578.2019.09.009
    By:
    • 许益民;
    • 刘占鹏;
    • 高猛;
    • 陈洪光;
    • 柴晓玲;
    • 王先亮;
    • 董珍书
    Publication type:
    Article
    12
    13
    14
    15
    16
    17

    复合冲击频率配合特性模拟研究.

    Published in:
    China Petroleum Machinery, 2019, v. 47, n. 9, p. 30, doi. 10.16082/j.cnki.issn.1001-4578.2019.09.005
    By:
    • 李玉梅;
    • 张涛;
    • 苏中;
    • 于丽维;
    • 刘建明
    Publication type:
    Article
    18

    CD-GF型钻井球阀阀体的力学特性分析.

    Published in:
    China Petroleum Machinery, 2019, v. 47, n. 9, p. 23, doi. 10.16082/j.cnki.issn.1001-4578.2019.09.004
    By:
    • 易先中;
    • 姚治明;
    • 周元华;
    • 杨增辉;
    • 盛治新;
    • 宋顺平
    Publication type:
    Article
    19
    20
    21