Works matching IS 10012311 AND DT 2022 AND VI 51 AND IP 2


Results: 18
    1
    2
    3
    4

    下井套管上扣不到位原因分析.

    Published in:
    Steel Pipe, 2022, v. 51, n. 2, p. 65, doi. 10.19938/j.steelpipe.l001-2311.2022.2.65.70
    By:
    • 罗华权;
    • 杨力能;
    • 刘文红;
    • 王航;
    • 张秋芳;
    • 耿 鹏
    Publication type:
    Article
    5

    整体式预弯机装配工艺优化.

    Published in:
    Steel Pipe, 2022, v. 51, n. 2, p. 62, doi. 10.19938/j.steelpipe.l001-2311.2022.2.62.64
    By:
    • 吴泽波;
    • 朱殿瑞;
    • 郝江;
    • 原宝峰;
    • 高星
    Publication type:
    Article
    6
    7
    8
    9
    10
    11

    钢管半浸式淬火技术及设备研发.

    Published in:
    Steel Pipe, 2022, v. 51, n. 2, p. 38, doi. 10.19938/j.steelpipe.l001-2311.2022.2.38.41
    By:
    • 杜学斌;
    • 张建军;
    • 马辉;
    • 王宏亮;
    • 谷瑞杰;
    • 高璐;
    • 王建国
    Publication type:
    Article
    12
    13
    14
    15
    16
    17
    18