Works in Journal of Engineering for Thermal Energy & Power / Reneng Dongli Gongcheng, 2018, Vol 33, Issue 2


Results: 22
    1

    600 MW级超临界机组通流改造方案比较.

    Published in:
    Journal of Engineering for Thermal Energy & Power / Reneng Dongli Gongcheng, 2018, v. 33, n. 2, p. 148, doi. 10.16146/j.cnki.rndlgc.2018.02.022
    By:
    • 徐星;
    • 谭锐
    Publication type:
    Article
    2
    3
    4
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15

    船舶涡轮高速轴系动力学特性试验.

    Published in:
    Journal of Engineering for Thermal Energy & Power / Reneng Dongli Gongcheng, 2018, v. 33, n. 2, p. 46, doi. 10.16146/j.cnki.rndlgc.2018.02.008
    By:
    • 徐巍;
    • 韦俊;
    • 康磊;
    • 王冠洲
    Publication type:
    Article
    16
    17
    18

    耦合吸收式热泵机组变工况分析.

    Published in:
    Journal of Engineering for Thermal Energy & Power / Reneng Dongli Gongcheng, 2018, v. 33, n. 2, p. 25, doi. 10.16146/j.cnki.rndlgc.2018.02.005
    By:
    • 郭中旭;
    • 戈志华;
    • 赵世飞;
    • 杨志平
    Publication type:
    Article
    19
    20
    21
    22

    等温压缩空气储能技术综述.

    Published in:
    Journal of Engineering for Thermal Energy & Power / Reneng Dongli Gongcheng, 2018, v. 33, n. 2, p. 1, doi. 10.16146/j.cnki.rndlgc.2018.02.001
    By:
    • 何子伟;
    • 罗马吉;
    • 涂正凯
    Publication type:
    Article