Works matching IS 09731318 AND DT 2010 AND VI 6 AND IP 6
Results: 12
A New Insight into k-out-of-n Warm Standby Model.
- Published in:
- International Journal of Performability Engineering, 2010, v. 6, n. 6, p. 615
- By:
- Publication type:
- Article
Entry Mode Choice between Wholly-Owned Subsidiary and Joint Venture: A Case Study of the Automotive Industry in India.
- Published in:
- 2010
- By:
- Publication type:
- Case Study
Risk Governance: Coping with Uncertainty in a Complex World.
- Published in:
- 2010
- By:
- Publication type:
- Book Review
Cost Effective Maintenance Policy: A Case Study.
- Published in:
- 2010
- By:
- Publication type:
- Case Study
Uncertainty and Risk: Multidisciplinary Perspectives.
- Published in:
- 2010
- By:
- Publication type:
- Book Review
A Crucial Strategy for the Success of Six Sigma Implementation.
- Published in:
- International Journal of Performability Engineering, 2010, v. 6, n. 6, p. 587
- By:
- Publication type:
- Article
Design for Reliability: Overview of the Process and Applicable Techniques.
- Published in:
- 2010
- By:
- Publication type:
- Case Study
Improvement of Segment Business using DMAIC Methodology: A Case Study.
- Published in:
- 2010
- By:
- Publication type:
- Case Study
Integrating LDP Lean Document Production solution within the DMEDI Methodology.
- Published in:
- 2010
- By:
- Publication type:
- Case Study
Successful Application of Software Reliability: A Case Study.
- Published in:
- 2010
- By:
- Publication type:
- Case Study
Success Stories on Reliability and Six Sigma.
- Published in:
- International Journal of Performability Engineering, 2010, v. 6, n. 6, p. 530
- By:
- Publication type:
- Article
Editorial.
- Published in:
- International Journal of Performability Engineering, 2010, v. 6, n. 6, p. 529
- By:
- Publication type:
- Article