Works matching IS 09473602 AND DT 2005 AND VI 10 AND IP 4
Results: 5
Communication gaps in a tender process.
- Published in:
- Requirements Engineering, 2005, v. 10, n. 4, p. 247, doi. 10.1007/s00766-005-0009-2
- By:
- Publication type:
- Article
Applying a pragmatics-based creativity-fostering technique to requirements elicitation.
- Published in:
- Requirements Engineering, 2005, v. 10, n. 4, p. 262, doi. 10.1007/s00766-005-0008-3
- By:
- Publication type:
- Article
Improving the detection of requirements discordances among stakeholders.
- Published in:
- Requirements Engineering, 2005, v. 10, n. 4, p. 289, doi. 10.1007/s00766-005-0017-2
- By:
- Publication type:
- Article
Guest editorial: 10th anniversary workshop on Requirements Engineering: Foundation for Software Quality (REFSQ’2004).
- Published in:
- 2005
- By:
- Publication type:
- Editorial
Generating requirements from systems models using patterns: a case study.
- Published in:
- Requirements Engineering, 2005, v. 10, n. 4, p. 276, doi. 10.1007/s00766-005-0010-9
- By:
- Publication type:
- Article