Works matching IS 09204741 AND DT 2004 AND VI 18 AND IP 2
Results: 5
Multi-Person Multiobjective Fuzzy Decision-Making Model for Reservoir Flood Control Operation.
- Published in:
- Water Resources Management, 2004, v. 18, n. 2, p. 111, doi. 10.1023/B:WARM.0000024705.63932.3c
- By:
- Publication type:
- Article
Irrigation Planning using Genetic Algorithms.
- Published in:
- Water Resources Management, 2004, v. 18, n. 2, p. 163, doi. 10.1023/B:WARM.0000024738.72486.b2
- By:
- Publication type:
- Article
Application of Non-Linear Simulation and Optimisation Models in Groundwater Aquifer Management.
- Published in:
- Water Resources Management, 2004, v. 18, n. 2, p. 125, doi. 10.1023/B:WARM.0000024723.17916.64
- By:
- Publication type:
- Article
Sensitivity of the Red River Basin Flood Protection System to Climate Variability and Change.
- Published in:
- Water Resources Management, 2004, v. 18, n. 2, p. 89, doi. 10.1023/B:WARM.0000024702.40031.b2
- By:
- Publication type:
- Article
River Flow Forecasting using Recurrent Neural Networks.
- Published in:
- Water Resources Management, 2004, v. 18, n. 2, p. 143, doi. 10.1023/B:WARM.0000024727.94701.12
- By:
- Publication type:
- Article