Works matching IS 0894069X AND DT 2023 AND VI 70 AND IP 3
Results: 6
Maximizing the weighted number of just‐in‐time jobs in a distributed flow‐shop scheduling system.
- Published in:
- Naval Research Logistics, 2023, v. 70, n. 3, p. 274, doi. 10.1002/nav.22097
- By:
- Publication type:
- Article
A phase I change‐point method for high‐dimensional process with sparse mean shifts.
- Published in:
- Naval Research Logistics, 2023, v. 70, n. 3, p. 261, doi. 10.1002/nav.22095
- By:
- Publication type:
- Article
Commission, product quality and return policy in agency selling.
- Published in:
- Naval Research Logistics, 2023, v. 70, n. 3, p. 231, doi. 10.1002/nav.22094
- By:
- Publication type:
- Article
Ranking and selection for pairwise comparison.
- Published in:
- Naval Research Logistics, 2023, v. 70, n. 3, p. 284, doi. 10.1002/nav.22093
- By:
- Publication type:
- Article
Reliability analysis for shock systems based on damage evolutions via Markov processes.
- Published in:
- Naval Research Logistics, 2023, v. 70, n. 3, p. 246, doi. 10.1002/nav.22091
- By:
- Publication type:
- Article
Issue Information.
- Published in:
- Naval Research Logistics, 2023, v. 70, n. 3, p. 229, doi. 10.1002/nav.22062
- Publication type:
- Article