Works matching IS 0894069X AND DT 2011 AND VI 58 AND IP 1
Results: 5
Cyclic scheduling in robotic flowshops with bounded work-in-process levels.
- Published in:
- Naval Research Logistics, 2011, v. 58, n. 1, p. 1, doi. 10.1002/nav.20435
- By:
- Publication type:
- Article
Inventory control in divergent supply chains with time-based dispatching and shipment consolidation.
- Published in:
- Naval Research Logistics, 2011, v. 58, n. 1, p. 59, doi. 10.1002/nav.20441
- By:
- Publication type:
- Article
Optimal control of a capacitated inventory system with multiple demand classes.
- Published in:
- Naval Research Logistics, 2011, v. 58, n. 1, p. 43, doi. 10.1002/nav.20438
- By:
- Publication type:
- Article
Scheduling with centralized and decentralized batching policies in concurrent open shops.
- Published in:
- Naval Research Logistics, 2011, v. 58, n. 1, p. 17, doi. 10.1002/nav.20437
- By:
- Publication type:
- Article
Call center arrival modeling: A Bayesian state-space approach.
- Published in:
- Naval Research Logistics, 2011, v. 58, n. 1, p. 28, doi. 10.1002/nav.20436
- By:
- Publication type:
- Article