Works matching IS 0894069X AND DT 2004 AND VI 51 AND IP 8


Results: 6
    1
    2
    3
    4

    Scheduling recurrent construction.

    Published in:
    Naval Research Logistics, 2004, v. 51, n. 8, p. 1102, doi. 10.1002/nav.20043
    By:
    • Schmitt, Thomas;
    • Faaland, Bruce
    Publication type:
    Article
    5
    6