Works matching IS 0894069X AND DT 2001 AND VI 48 AND IP 2
Results: 5
Variables inspection for SPC-quarantined production.
- Published in:
- Naval Research Logistics, 2001, v. 48, n. 2, p. 159, doi. 10.1002/1520-6750(200103)48:2<159::AID-NAV4>3.0.CO;2-Q
- By:
- Publication type:
- Article
Deterministic inventory lot-size models under inflation with shortages and deterioration for fluctuating demand.
- Published in:
- Naval Research Logistics, 2001, v. 48, n. 2, p. 144, doi. 10.1002/1520-6750(200103)48:2<144::AID-NAV3>3.0.CO;2-8
- By:
- Publication type:
- Article
Analysis of a production system in a general configuration.
- Published in:
- Naval Research Logistics, 2001, v. 48, n. 2, p. 128, doi. 10.1002/1520-6750(200103)48:2<128::AID-NAV2>3.0.CO;2-1
- By:
- Publication type:
- Article
The resource constrained project scheduling problem with multiple crashable modes: An exact solution method.
- Published in:
- Naval Research Logistics, 2001, v. 48, n. 2, p. 107, doi. 10.1002/1520-6750(200103)48:2<107::AID-NAV1>3.0.CO;2-9
- By:
- Publication type:
- Article
Sequential imperfect preventive maintenance models with two categories of failure modes.
- Published in:
- Naval Research Logistics, 2001, v. 48, n. 2, p. 172, doi. 10.1002/1520-6750(200103)48:2<172::AID-NAV5>3.0.CO;2-5
- By:
- Publication type:
- Article