Works matching IS 0894069X AND DT 1999 AND VI 46 AND IP 8
Results: 7
Minimizing makespan in a multimode multiprocessor shop scheduling problem.
- Published in:
- Naval Research Logistics, 1999, v. 46, n. 8, p. 893, doi. 10.1002/(SICI)1520-6750(199912)46:8<893::AID-NAV2>3.0.CO;2-7
- By:
- Publication type:
- Article
Heuristic procedures for scheduling job families with setups and due dates.
- Published in:
- Naval Research Logistics, 1999, v. 46, n. 8, p. 978, doi. 10.1002/(SICI)1520-6750(199912)46:8<978::AID-NAV7>3.0.CO;2-D
- By:
- Publication type:
- Article
Modeling and analysis of vessel casualties resulting from tanker traffic through narrow waterways.
- Published in:
- Naval Research Logistics, 1999, v. 46, n. 8, p. 871, doi. 10.1002/(SICI)1520-6750(199912)46:8<871::AID-NAV1>3.0.CO;2-I
- By:
- Publication type:
- Article
Preservation of unimodality under shock models.
- Published in:
- Naval Research Logistics, 1999, v. 46, n. 8, p. 952, doi. 10.1002/(SICI)1520-6750(199912)46:8<952::AID-NAV5>3.0.CO;2-2
- By:
- Publication type:
- Article
A metaheuristic scheduling procedure for resource-constrained projects with cash flows.
- Published in:
- Naval Research Logistics, 1999, v. 46, n. 8, p. 912, doi. 10.1002/(SICI)1520-6750(199912)46:8<912::AID-NAV3>3.0.CO;2-C
- By:
- Publication type:
- Article
Economic design of a two-stage control chart based on both performance and surrogate variables.
- Published in:
- Naval Research Logistics, 1999, v. 46, n. 8, p. 958, doi. 10.1002/(SICI)1520-6750(199912)46:8<958::AID-NAV6>3.0.CO;2-I
- By:
- Publication type:
- Article
The power of the ( x̄, s) control chart based on the log-likelihood ratio statistic.
- Published in:
- Naval Research Logistics, 1999, v. 46, n. 8, p. 928, doi. 10.1002/(SICI)1520-6750(199912)46:8<928::AID-NAV4>3.0.CO;2-R
- By:
- Publication type:
- Article