Works matching IS 0894069X AND DT 1991 AND VI 38 AND IP 5
Results: 10
A planning horizon algorithm for deterministic inventory management with piecewise linear concave costs.
- Published in:
- Naval Research Logistics, 1991, v. 38, n. 5, p. 729, doi. 10.1002/1520-6750(199110)38:5<729::AID-NAV3220380508>3.0.CO;2-U
- By:
- Publication type:
- Article
Economic lot scheduling of fully loaded processes with external setups.
- Published in:
- Naval Research Logistics, 1991, v. 38, n. 5, p. 699, doi. 10.1002/1520-6750(199110)38:5<699::AID-NAV3220380505>3.0.CO;2-J
- By:
- Publication type:
- Article
An analytic basis for decision support in negotiations.
- Published in:
- Naval Research Logistics, 1991, v. 38, n. 5, p. 743, doi. 10.1002/1520-6750(199110)38:5<743::AID-NAV3220380509>3.0.CO;2-R
- By:
- Publication type:
- Article
A descent approach to solving the complementary programming problem.
- Published in:
- Naval Research Logistics, 1991, v. 38, n. 5, p. 679, doi. 10.1002/1520-6750(199110)38:5<679::AID-NAV3220380504>3.0.CO;2-S
- By:
- Publication type:
- Article
Masthead.
- Published in:
- Naval Research Logistics, 1991, v. 38, n. 5, p. fmi, doi. 10.1002/1520-6750(199110)38:5<::AID-NAV3220380501>3.0.CO;2-O
- Publication type:
- Article
Facility location when demand is time dependent.
- Published in:
- Naval Research Logistics, 1991, v. 38, n. 5, p. 763, doi. 10.1002/1520-6750(199110)38:5<763::AID-NAV3220380510>3.0.CO;2-A
- By:
- Publication type:
- Article
Interactive optimization methodology for fleet scheduling.
- Published in:
- Naval Research Logistics, 1991, v. 38, n. 5, p. 669, doi. 10.1002/1520-6750(199110)38:5<669::AID-NAV3220380503>3.0.CO;2-Y
- By:
- Publication type:
- Article
A single-machine problem with multiple criteria.
- Published in:
- Naval Research Logistics, 1991, v. 38, n. 5, p. 721, doi. 10.1002/1520-6750(199110)38:5<721::AID-NAV3220380507>3.0.CO;2-4
- By:
- Publication type:
- Article
Optimal sequential replenishment of ships during combat.
- Published in:
- Naval Research Logistics, 1991, v. 38, n. 5, p. 637, doi. 10.1002/1520-6750(199110)38:5<637::AID-NAV3220380502>3.0.CO;2-B
- By:
- Publication type:
- Article
A proof for the longest-job-first policy in one-machine scheduling.
- Published in:
- Naval Research Logistics, 1991, v. 38, n. 5, p. 715, doi. 10.1002/1520-6750(199110)38:5<715::AID-NAV3220380506>3.0.CO;2-6
- By:
- Publication type:
- Article