Works matching IS 08856087 AND DT 2013 AND VI 27 AND IP 9
Results: 8
Uncertainty in the estimation of backwater effects at bridge crossings.
- Published in:
- Hydrological Processes, 2013, v. 27, n. 9, p. 1292, doi. 10.1002/hyp.9350
- By:
- Publication type:
- Article
HP - Special Issue on Flood Risk and Uncertainty.
- Published in:
- Hydrological Processes, 2013, v. 27, n. 9, p. 1291, doi. 10.1002/hyp.9812
- By:
- Publication type:
- Article
Hydraulic modelling calibration in small rivers by using coarse resolution synthetic aperture radar imagery.
- Published in:
- Hydrological Processes, 2013, v. 27, n. 9, p. 1321, doi. 10.1002/hyp.9550
- By:
- Publication type:
- Article
Probabilistic flood risk mapping including spatial dependence.
- Published in:
- Hydrological Processes, 2013, v. 27, n. 9, p. 1349, doi. 10.1002/hyp.9572
- By:
- Publication type:
- Article
Testing a simple 2D hydraulic model in an urban flood experiment.
- Published in:
- Hydrological Processes, 2013, v. 27, n. 9, p. 1301, doi. 10.1002/hyp.9370
- By:
- Publication type:
- Article
Reconstruction and analysis of the Po River inundation of 1951.
- Published in:
- Hydrological Processes, 2013, v. 27, n. 9, p. 1341, doi. 10.1002/hyp.9558
- By:
- Publication type:
- Article
Issue Information.
- Published in:
- Hydrological Processes, 2013, v. 27, n. 9, p. i, doi. 10.1002/hyp.9795
- Publication type:
- Article
Hydraulic model evaluation for large-scale flood risk assessments.
- Published in:
- Hydrological Processes, 2013, v. 27, n. 9, p. 1331, doi. 10.1002/hyp.9553
- By:
- Publication type:
- Article