Works matching IS 07339364 AND DT 2011 AND VI 137 AND IP 12
Results: 21
Proposed Framework for Applying Cumulative Prospect Theory to an Unbalanced Bidding Model.
- Published in:
- Journal of Construction Engineering & Management, 2011, v. 137, n. 12, p. 1052, doi. 10.1061/(ASCE)CO.1943-7862.0000367
- By:
- Publication type:
- Article
Is Customization Fruitful in Industrialized Homebuilding Industry?
- Published in:
- Journal of Construction Engineering & Management, 2011, v. 137, n. 12, p. 1027, doi. 10.1061/(ASCE)CO.1943-7862.0000396
- By:
- Publication type:
- Article
Chemical Properties of Blended Cement Pastes.
- Published in:
- Journal of Construction Engineering & Management, 2011, v. 137, n. 12, p. 1036, doi. 10.1061/(ASCE)CO.1943-7862.0000378
- By:
- Publication type:
- Article
Project Delivery Metrics for Sustainable, High-Performance Buildings.
- Published in:
- 2011
- By:
- Publication type:
- Case Study
Dynamics of Rework in Complex Offshore Hydrocarbon Projects.
- Published in:
- Journal of Construction Engineering & Management, 2011, v. 137, n. 12, p. 1060, doi. 10.1061/(ASCE)CO.1943-7862.0000377
- By:
- Publication type:
- Article
Withdrawal in Construction Project Dispute Negotiation.
- Published in:
- Journal of Construction Engineering & Management, 2011, v. 137, n. 12, p. 1071, doi. 10.1061/(ASCE)CO.1943-7862.0000388
- By:
- Publication type:
- Article
Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling.
- Published in:
- Journal of Construction Engineering & Management, 2011, v. 137, n. 12, p. 1080, doi. 10.1061/(ASCE)CO.1943-7862.0000368
- By:
- Publication type:
- Article
Life-Cycle Approach for Implementing RFID Technology in Construction: Learning from Academic and Industry Use Cases.
- Published in:
- Journal of Construction Engineering & Management, 2011, v. 137, n. 12, p. 1089, doi. 10.1061/(ASCE)CO.1943-7862.0000376
- By:
- Publication type:
- Article
Activity Analysis for Direct-Work Rate Improvement in Construction.
- Published in:
- 2011
- By:
- Publication type:
- Case Study
Integrated Sequential As-Built and As-Planned Representation with D<sup>4</sup>AR Tools in Support of Decision-Making Tasks in the AEC/FM Industry.
- Published in:
- 2011
- By:
- Publication type:
- Case Study
Mini-Excavator Safety: Toward Innovative Stability Testing, Procurement, and Manufacture.
- Published in:
- Journal of Construction Engineering & Management, 2011, v. 137, n. 12, p. 1125, doi. 10.1061/(ASCE)CO.1943-7862.0000383
- By:
- Publication type:
- Article
Goal and Process Alignment during the Implementation of Decision Support Systems by Project Teams.
- Published in:
- 2011
- By:
- Publication type:
- Case Study
Evaluating the Knowledge Management Practices of Construction Firms by Using Importance-Comparative Performance Analysis Maps.
- Published in:
- 2011
- By:
- Publication type:
- Case Study
Critical Project Management Factors of AEC Firms for Delivering Green Building Projects in Singapore.
- Published in:
- Journal of Construction Engineering & Management, 2011, v. 137, n. 12, p. 1153, doi. 10.1061/(ASCE)CO.1943-7862.0000370
- By:
- Publication type:
- Article
Identification of Risk Paths in International Construction Projects Using Structural Equation Modeling.
- Published in:
- Journal of Construction Engineering & Management, 2011, v. 137, n. 12, p. 1164, doi. 10.1061/(ASCE)CO.1943-7862.0000382
- By:
- Publication type:
- Article
Developing a Fuzzy Multicriteria Decision-Making Model for Selecting Design-Build Operational Variations.
- Published in:
- Journal of Construction Engineering & Management, 2011, v. 137, n. 12, p. 1176, doi. 10.1061/(ASCE)CO.1943-7862.0000381
- By:
- Publication type:
- Article
Risk Assessment Methodology for a Deep Foundation Pit Construction Project in Shanghai, China.
- Published in:
- 2011
- By:
- Publication type:
- Case Study
Energy Management Reduces Great Pyramid Build Effort by More Than 98%.
- Published in:
- Journal of Construction Engineering & Management, 2011, v. 137, n. 12, p. 1195, doi. 10.1061/(ASCE)CO.1943-7862.0000373
- By:
- Publication type:
- Article
Fuzzy AHP-Based Risk Assessment Methodology for PPP Projects.
- Published in:
- Journal of Construction Engineering & Management, 2011, v. 137, n. 12, p. 1205, doi. 10.1061/(ASCE)CO.1943-7862.0000362
- By:
- Publication type:
- Article
Erratum for 'Productivity Scheduling Method: Linear Schedule Analysis with Singularity Functions' by Gunnar Lucko.
- Published in:
- 2011
- By:
- Publication type:
- Correction Notice
Reviewers.
- Published in:
- Journal of Construction Engineering & Management, 2011, v. 137, n. 12, p. 1211, doi. 10.1061/(ASCE)CO.1943-7862.0000486
- Publication type:
- Article