Works matching IS 07339364 AND DT 2009 AND VI 135 AND IP 2
Results: 8
Developing a Decision Support Tool for Nighttime Construction in Highway Projects.
- Published in:
- Journal of Construction Engineering & Management, 2009, v. 135, n. 2, p. 119, doi. 10.1061/(ASCE)0733-9364(2009)135:2(119)
- By:
- Publication type:
- Article
Integrated Model for the Stressors and Stresses of Construction Project Managers in Hong Kong.
- Published in:
- Journal of Construction Engineering & Management, 2009, v. 135, n. 2, p. 126, doi. 10.1061/(ASCE)0733-9364(2009)135:2(126)
- By:
- Publication type:
- Article
2007 Best Paper Award.
- Published in:
- Journal of Construction Engineering & Management, 2009, v. 135, n. 2, p. 73, doi. 10.1061/(ASCE)0733-9364(2009)135:2(73)
- By:
- Publication type:
- Article
Editor’s Note.
- Published in:
- Journal of Construction Engineering & Management, 2009, v. 135, n. 2, p. 74, doi. 10.1061/(ASCE)0733-9364(2009)135:2(74)
- By:
- Publication type:
- Article
Performance and Strategy of Chinese Contractors in the International Market.
- Published in:
- Journal of Construction Engineering & Management, 2009, v. 135, n. 2, p. 108, doi. 10.1061/(ASCE)0733-9364(2009)135:2(108)
- By:
- Publication type:
- Article
Float Allocation Using the Total Risk Approach.
- Published in:
- Journal of Construction Engineering & Management, 2009, v. 135, n. 2, p. 88, doi. 10.1061/(ASCE)0733-9364(2009)135:2(88)
- By:
- Publication type:
- Article
Comparative Analysis of Infrastructure Assessment Methodologies at the Small Unit Level.
- Published in:
- Journal of Construction Engineering & Management, 2009, v. 135, n. 2, p. 96, doi. 10.1061/(ASCE)0733-9364(2009)135:2(96)
- By:
- Publication type:
- Article
Contractor Perspective on Factors for Evaluating Installation Options for Small-Diameter Utilities.
- Published in:
- Journal of Construction Engineering & Management, 2009, v. 135, n. 2, p. 75, doi. 10.1061/(ASCE)0733-9364(2009)135:2(75)
- By:
- Publication type:
- Article