Works matching IS 03151468 AND DT 2012 AND VI 39 AND IP 9
Results: 14
Special Issue on Construction Engineering and Management / Numéro spécial consacré à la gestion et au génie de la construction.
- Published in:
- Canadian Journal of Civil Engineering, 2012, v. 39, n. 9, p. iii, doi. 10.1139/l2012-096
- Publication type:
- Article
Dynamics of workforce skill evolution in construction projects.
- Published in:
- Canadian Journal of Civil Engineering, 2012, v. 39, n. 9, p. 1005, doi. 10.1139/l2012-087
- By:
- Publication type:
- Article
Introduction to the Special Issue on Construction Engineering and Management.
- Published in:
- Canadian Journal of Civil Engineering, 2012, v. 39, n. 9, p. v, doi. 10.1139/l2012-085
- Publication type:
- Article
Using digital photogrammetry for pipe-works progress tracking.
- Published in:
- Canadian Journal of Civil Engineering, 2012, v. 39, n. 9, p. 1062, doi. 10.1139/l2012-055
- Publication type:
- Article
A framework for indoor construction resources tracking by applying wireless sensor networks.
- Published in:
- Canadian Journal of Civil Engineering, 2012, v. 39, n. 9, p. 1083, doi. 10.1139/l2012-094
- Publication type:
- Article
Contractor default prediction model for surety bonding.
- Published in:
- Canadian Journal of Civil Engineering, 2012, v. 39, n. 9, p. 1027, doi. 10.1139/l2012-028
- By:
- Publication type:
- Article
Generational differences on craft workers' perceptions of the factors affecting labour productivity.
- Published in:
- Canadian Journal of Civil Engineering, 2012, v. 39, n. 9, p. 1018, doi. 10.1139/l2012-053
- By:
- Publication type:
- Article
Transaction ontology in the domain of infrastructure management.
- Published in:
- Canadian Journal of Civil Engineering, 2012, v. 39, n. 9, p. 993, doi. 10.1139/l2012-054
- Publication type:
- Article
Post simulation visualization model for effective scheduling of modular building construction.
- Published in:
- Canadian Journal of Civil Engineering, 2012, v. 39, n. 9, p. 1053, doi. 10.1139/l2012-077
- By:
- Publication type:
- Article
Facilitating team decision-making through reimbursable contracting strategies.
- Published in:
- Canadian Journal of Civil Engineering, 2012, v. 39, n. 9, p. 1043, doi. 10.1139/l2012-052
- Publication type:
- Article
Development and implementation of a benchmarking and metrics program for construction performance and productivity improvement.
- Published in:
- Canadian Journal of Civil Engineering, 2012, v. 39, n. 9, p. 957, doi. 10.1139/l2012-030
- By:
- Publication type:
- Article
Multiobjective genetic algorithm to allocate budgetary resources for condition assessment of water and sewer networks.
- Published in:
- Canadian Journal of Civil Engineering, 2012, v. 39, n. 9, p. 978, doi. 10.1139/l2012-049
- By:
- Publication type:
- Article
Estimating productivity of earthmoving operations using spatial technologies.
- Published in:
- Canadian Journal of Civil Engineering, 2012, v. 39, n. 9, p. 1072, doi. 10.1139/l2012-059
- Publication type:
- Article
Enhancing the critical path segments scheduling technique for project control.
- Published in:
- Canadian Journal of Civil Engineering, 2012, v. 39, n. 9, p. 968, doi. 10.1139/l2012-024
- Publication type:
- Article