Works matching IS 03151468 AND DT 2008 AND VI 35 AND IP 5


Results: 10
    1

    Contractor selection: fuzzy-control approach.

    Published in:
    Canadian Journal of Civil Engineering, 2008, v. 35, n. 5, p. 473, doi. 10.1139/L07-127
    By:
    • Bendaña, Ricardo;
    • del Caño, Alfredo;
    • Pilar de la Cruz, M.
    Publication type:
    Article
    2
    3
    4
    5
    6
    7
    8
    9
    10

    Flow over a fixed rough dune.

    Published in:
    Canadian Journal of Civil Engineering, 2008, v. 35, n. 5, p. 511, doi. 10.1139/L08-004
    By:
    • Balachandar, Ram;
    • Patel, V. C.
    Publication type:
    Article