Works matching IS 02726963 AND DT 1989 AND VI 8 AND IP 2
Results: 6
Dynamic Lot Sizing Techniques: Survey and Comparison.
- Published in:
- 1989
- Publication type:
- Correction Notice
A NOTE ON SOLVING THE CONCAVE COST DYNAMIC LOT-SIZING PROBLEM IN ALMOST LINEAR TIME.
- Published in:
- Journal of Operations Management, 1989, v. 8, n. 2, p. 159, doi. 10.1016/0272-6963(89)90017-X
- By:
- Publication type:
- Article
OPERATIONS STRATEGY: A LITERATURE REVIEW.
- Published in:
- Journal of Operations Management, 1989, v. 8, n. 2, p. 133, doi. 10.1016/0272-6963(89)90016-8
- By:
- Publication type:
- Article
DUE DATE BASED SCHEDULING IN A GENERAL FLEXIBLE MANUFACTURING SYSTEM.
- Published in:
- Journal of Operations Management, 1989, v. 8, n. 2, p. 115, doi. 10.1016/0272-6963(89)90015-6
- By:
- Publication type:
- Article
IMPROVED HIERARCHICAL PRODUCTION PLANNING.
- Published in:
- Journal of Operations Management, 1989, v. 8, n. 2, p. 90, doi. 10.1016/0272-6963(89)90014-4
- By:
- Publication type:
- Article
TOOLING CONSTRAINTS AND SHOP FLOOR SCHEDULING: A SIMULATION STUDY.
- Published in:
- Journal of Operations Management, 1989, v. 8, n. 2, p. 69, doi. 10.1016/0272-6963(89)90013-2
- By:
- Publication type:
- Article