Works matching IS 02545330 AND DT 2014 AND VI 213 AND IP 1
Results: 18
Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective.
- Published in:
- Annals of Operations Research, 2014, v. 213, n. 1, p. 203, doi. 10.1007/s10479-012-1155-9
- By:
- Publication type:
- Article
On some properties of optimal schedules in the job shop problem with preemption and an arbitrary regular criterion.
- Published in:
- Annals of Operations Research, 2014, v. 213, n. 1, p. 253, doi. 10.1007/s10479-012-1290-3
- By:
- Publication type:
- Article
Power-aware scheduling of preemptable jobs on identical parallel processors to minimize makespan.
- Published in:
- Annals of Operations Research, 2014, v. 213, n. 1, p. 235, doi. 10.1007/s10479-011-0957-5
- By:
- Publication type:
- Article
Optimal solutions for a dock assignment problem with trailer transportation.
- Published in:
- Annals of Operations Research, 2014, v. 213, n. 1, p. 3, doi. 10.1007/s10479-011-0971-7
- By:
- Publication type:
- Article
A matheuristic approach for the two-machine total completion time flow shop problem.
- Published in:
- Annals of Operations Research, 2014, v. 213, n. 1, p. 67, doi. 10.1007/s10479-011-0928-x
- By:
- Publication type:
- Article
Approximability results for the resource-constrained project scheduling problem with a single type of resources.
- Published in:
- Annals of Operations Research, 2014, v. 213, n. 1, p. 115, doi. 10.1007/s10479-012-1106-5
- By:
- Publication type:
- Article
Two-agent scheduling on uniform parallel machines with min-max criteria.
- Published in:
- Annals of Operations Research, 2014, v. 213, n. 1, p. 79, doi. 10.1007/s10479-012-1099-0
- By:
- Publication type:
- Article
A new approach for quantitative risk analysis.
- Published in:
- Annals of Operations Research, 2014, v. 213, n. 1, p. 27, doi. 10.1007/s10479-013-1355-y
- By:
- Publication type:
- Article
Isomorphic scheduling problems.
- Published in:
- Annals of Operations Research, 2014, v. 213, n. 1, p. 131, doi. 10.1007/s10479-012-1222-2
- By:
- Publication type:
- Article
Solving an integrated job-shop problem with human resource constraints.
- Published in:
- Annals of Operations Research, 2014, v. 213, n. 1, p. 147, doi. 10.1007/s10479-012-1132-3
- By:
- Publication type:
- Article
Discrete-continuous project scheduling with discounted cash inflows and various payment models-a review of recent results.
- Published in:
- Annals of Operations Research, 2014, v. 213, n. 1, p. 319, doi. 10.1007/s10479-011-1014-0
- By:
- Publication type:
- Article
Preface.
- Published in:
- 2014
- By:
- Publication type:
- Editorial
Integrated production and distribution scheduling with lifespan constraints.
- Published in:
- Annals of Operations Research, 2014, v. 213, n. 1, p. 293, doi. 10.1007/s10479-012-1197-z
- By:
- Publication type:
- Article
Makespan minimization for parallel machines scheduling with multiple availability constraints.
- Published in:
- Annals of Operations Research, 2014, v. 213, n. 1, p. 173, doi. 10.1007/s10479-012-1059-8
- By:
- Publication type:
- Article
Batch sizing and just-in-time scheduling with common due date.
- Published in:
- Annals of Operations Research, 2014, v. 213, n. 1, p. 187, doi. 10.1007/s10479-012-1289-9
- By:
- Publication type:
- Article
Scheduling job families on non-identical parallel machines with time constraints.
- Published in:
- Annals of Operations Research, 2014, v. 213, n. 1, p. 221, doi. 10.1007/s10479-012-1107-4
- By:
- Publication type:
- Article
Stable multi-skill workforce assignments.
- Published in:
- Annals of Operations Research, 2014, v. 213, n. 1, p. 95, doi. 10.1007/s10479-012-1224-0
- By:
- Publication type:
- Article
Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment.
- Published in:
- Annals of Operations Research, 2014, v. 213, n. 1, p. 271, doi. 10.1007/s10479-012-1277-0
- By:
- Publication type:
- Article