Works matching IS 01716468 AND DT 2020 AND VI 42 AND IP 4
Results: 9
Endogenous stochastic optimisation for relief distribution assisted with unmanned aerial vehicles.
- Published in:
- OR Spectrum, 2020, v. 42, n. 4, p. 1089, doi. 10.1007/s00291-020-00602-z
- By:
- Publication type:
- Article
Robust post-disaster route restoration.
- Published in:
- OR Spectrum, 2020, v. 42, n. 4, p. 1055, doi. 10.1007/s00291-020-00601-0
- By:
- Publication type:
- Article
Blood supply chain: a two-stage approach for tactical and operational planning.
- Published in:
- OR Spectrum, 2020, v. 42, n. 4, p. 1023, doi. 10.1007/s00291-020-00600-1
- By:
- Publication type:
- Article
Robust spotter scheduling in trailer yards.
- Published in:
- OR Spectrum, 2020, v. 42, n. 4, p. 995, doi. 10.1007/s00291-020-00599-5
- By:
- Publication type:
- Article
Strategyproof auction mechanisms for network procurement.
- Published in:
- OR Spectrum, 2020, v. 42, n. 4, p. 965, doi. 10.1007/s00291-020-00597-7
- By:
- Publication type:
- Article
Integrating nurse assignment in outpatient chemotherapy appointment scheduling.
- Published in:
- OR Spectrum, 2020, v. 42, n. 4, p. 935, doi. 10.1007/s00291-020-00596-8
- By:
- Publication type:
- Article
The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds.
- Published in:
- OR Spectrum, 2020, v. 42, n. 4, p. 901, doi. 10.1007/s00291-020-00595-9
- By:
- Publication type:
- Article
A two-phase stochastic programming approach to biomass supply planning for combined heat and power plants.
- Published in:
- OR Spectrum, 2020, v. 42, n. 4, p. 863, doi. 10.1007/s00291-020-00593-x
- By:
- Publication type:
- Article
Railway crew scheduling with semi-flexible timetables.
- Published in:
- OR Spectrum, 2020, v. 42, n. 4, p. 835, doi. 10.1007/s00291-020-00592-y
- By:
- Publication type:
- Article