Works matching IS 01716468 AND DT 2020 AND VI 42 AND IP 2
Results: 8
Time-based service constraints for inventory systems with commitment lead time.
- Published in:
- OR Spectrum, 2020, v. 42, n. 2, p. 355, doi. 10.1007/s00291-020-00590-0
- By:
- Publication type:
- Article
Coherent combination of probabilistic outputs for group decision making: an algebraic approach.
- Published in:
- OR Spectrum, 2020, v. 42, n. 2, p. 499, doi. 10.1007/s00291-020-00588-8
- By:
- Publication type:
- Article
Bi-objective optimization problems with two decision makers: refining Pareto-optimal front for equilibrium solution.
- Published in:
- OR Spectrum, 2020, v. 42, n. 2, p. 567, doi. 10.1007/s00291-020-00587-9
- By:
- Publication type:
- Article
Gradual cover competitive facility location.
- Published in:
- OR Spectrum, 2020, v. 42, n. 2, p. 333, doi. 10.1007/s00291-020-00585-x
- By:
- Publication type:
- Article
A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints.
- Published in:
- OR Spectrum, 2020, v. 42, n. 2, p. 427, doi. 10.1007/s00291-020-00583-z
- By:
- Publication type:
- Article
Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space.
- Published in:
- OR Spectrum, 2020, v. 42, n. 2, p. 397, doi. 10.1007/s00291-020-00580-2
- By:
- Publication type:
- Article
Centralized resource allocation based on cross-evaluation considering organizational objective and individual preferences.
- Published in:
- OR Spectrum, 2020, v. 42, n. 2, p. 529, doi. 10.1007/s00291-020-00579-9
- By:
- Publication type:
- Article
Exact and heuristic algorithms for scheduling jobs with time windows on unrelated parallel machines.
- Published in:
- OR Spectrum, 2020, v. 42, n. 2, p. 461, doi. 10.1007/s00291-020-00586-w
- By:
- Publication type:
- Article