Works matching IS 01716468 AND DT 2016 AND VI 38 AND IP 2
Results: 11
Two-machine open-shop scheduling with rejection to minimize the makespan.
- Published in:
- OR Spectrum, 2016, v. 38, n. 2, p. 519, doi. 10.1007/s00291-015-0409-8
- By:
- Publication type:
- Article
Machine scheduling in underground mining: an application in the potash industry.
- Published in:
- OR Spectrum, 2016, v. 38, n. 2, p. 365, doi. 10.1007/s00291-015-0414-y
- By:
- Publication type:
- Article
On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations.
- Published in:
- OR Spectrum, 2016, v. 38, n. 2, p. 283, doi. 10.1007/s00291-015-0419-6
- By:
- Publication type:
- Article
A sequential procurement model for a PPP project pipeline.
- Published in:
- OR Spectrum, 2016, v. 38, n. 2, p. 427, doi. 10.1007/s00291-015-0421-z
- By:
- Publication type:
- Article
Energetic reasoning and mixed-integer linear programming for scheduling with a continuous resource and linear efficiency functions.
- Published in:
- OR Spectrum, 2016, v. 38, n. 2, p. 459, doi. 10.1007/s00291-015-0423-x
- By:
- Publication type:
- Article
Worst-case analysis of the LPT algorithm for single processor scheduling with time restrictions.
- Published in:
- OR Spectrum, 2016, v. 38, n. 2, p. 531, doi. 10.1007/s00291-016-0431-5
- By:
- Publication type:
- Article
New formulations for the setup assembly line balancing and scheduling problem.
- Published in:
- OR Spectrum, 2016, v. 38, n. 2, p. 493, doi. 10.1007/s00291-016-0433-3
- By:
- Publication type:
- Article
Resource levelling in project scheduling with generalized precedence relationships and variable execution intensities.
- Published in:
- OR Spectrum, 2016, v. 38, n. 2, p. 405, doi. 10.1007/s00291-016-0435-1
- By:
- Publication type:
- Article
A rough-cut capacity planning model with overlapping.
- Published in:
- OR Spectrum, 2016, v. 38, n. 2, p. 335, doi. 10.1007/s00291-016-0436-0
- By:
- Publication type:
- Article
Editorial 'Project Management and Scheduling'.
- Published in:
- 2016
- By:
- Publication type:
- Editorial
A flow-based tabu search algorithm for the RCPSP with transfer times.
- Published in:
- OR Spectrum, 2016, v. 38, n. 2, p. 305, doi. 10.1007/s00291-015-0402-2
- By:
- Publication type:
- Article