Works matching IS 0003150X AND DT 1999 AND VI 91 AND IP 4


Results: 7
    1

    Training center targets small system operators

    Published in:
    Journal: American Water Works Association, 1999, v. 91, n. 4, p. 123, doi. 10.1002/j.1551-8833.1999.tb08618.x
    By:
    • Xie, Yuefeng;
    • Long, David A.;
    • Cole, Charles A.
    Publication type:
    Article
    2

    Predicting full-scale TOC removal

    Published in:
    Journal: American Water Works Association, 1999, v. 91, n. 4, p. 159
    By:
    • Edwards, Marc;
    • Tseng, Tai
    Publication type:
    Article
    3
    4
    5
    6

    Benefits and costs of the IESWTR

    Published in:
    Journal: American Water Works Association, 1999, v. 91, n. 4, p. 148
    By:
    • Odom, Rosemarie;
    • Regli, Stig;
    • Blank, Valerie;
    • Cromwell, John;
    • Lustic, Mike
    Publication type:
    Article
    7

    Benefit--cost analysis of the Stage 1 D/DBP Rule

    Published in:
    Journal: American Water Works Association, 1999, v. 91, n. 4, p. 137, doi. 10.1002/j.1551-8833.1999.tb08620.x
    By:
    • Odom, Rosemarie;
    • Regli, Stig;
    • Cromwell, John;
    • Javdan, Maggie;
    • Messner, Mike
    Publication type:
    Article