Works matching DE "WHARF maintenance %26 repair"
Results: 3
Repair of Corroded Prestressed Concrete Piles of Harbor Landing Stages.
- Published in:
- ACI Structural Journal, 2012, v. 109, n. 5, p. 715, doi. 10.14359/51684049
- By:
- Publication type:
- Article
Quay wall stability and strength evaluation.
- Published in:
- Mechanika, 2017, v. 23, n. 2, p. 298, doi. 10.5755/j01.mech.23.2.13776
- By:
- Publication type:
- Article
A probabilistic framework for correlated seismic downtime and repair cost estimation of geo-structures.
- Published in:
- Earthquake Engineering & Structural Dynamics, 2014, v. 43, n. 5, p. 739, doi. 10.1002/eqe.2369
- By:
- Publication type:
- Article