Found: 2
Select item for more details and to access through your institution.
Small tunnel, big solution: The Pearl River CSO storage and conveyance tunnel project.
- Published in:
- Mining Engineering, 2011, v. 63, n. 12, p. 55
- By:
- Publication type:
- Article
COST EFFECTIVENESS OF VEGETATIVE FILTER STRIPS AND INSTREAM HALF-LOGS FOR ECOLOGICAL RESTORATION.
- Published in:
- Journal of the American Water Resources Association, 2006, v. 42, n. 5, p. 1349, doi. 10.1111/j.1752-1688.2006.tb05617.x
- By:
- Publication type:
- Article