Works matching DE "SETUP time"


Results: 790
    1
    2
    3
    4
    5
    6
    7
    8
    9
    10
    11

    Geometric error compensation method using the Laser R-test.

    Published in:
    International Journal of Advanced Manufacturing Technology, 2024, v. 131, n. 7/8, p. 4035, doi. 10.1007/s00170-024-13099-5
    By:
    • Hsieh, Tung-Hsien;
    • Jywe, Wen-Yuh;
    • Zeng, Jheng-Jhong;
    • Hsu, Chia-Ming;
    • Chang, Yu-Wei
    Publication type:
    Article
    12
    13
    14
    15
    16
    17

    Workforce influence on manufacturing machines schedules.

    Published in:
    International Journal of Advanced Manufacturing Technology, 2021, v. 115, n. 3, p. 915, doi. 10.1007/s00170-020-06176-y
    By:
    • Caricato, Pierpaolo;
    • Grieco, Antonio;
    • Arigliano, Anna;
    • Rondone, Luciano
    Publication type:
    Article
    18
    19
    20
    21
    22
    23
    24
    25
    26
    27
    28
    29
    30
    31
    32
    33
    34
    35
    36
    37
    38
    39
    40
    41
    42
    43
    44
    45

    Fuzzy job shop scheduling with lot-sizing.

    Published in:
    Annals of Operations Research, 2008, v. 159, n. 1, p. 275, doi. 10.1007/s10479-007-0287-9
    By:
    • Petrovic, Sanja;
    • Fayad, Carole;
    • Petrovic, Dobrila;
    • Burke, Edmund;
    • Kendall, Graham
    Publication type:
    Article
    46
    47
    48
    49
    50