Works matching DE "PERT (Network analysis)"
Results: 249
Improving Project Time Estimation in Game Development: Rayleigh Distribution and Program Evaluation and Review Technique Approach.
- Published in:
- Jurnal Sosial dan Sains (SOSAINS), 2025, v. 5, n. 1, p. 35, doi. 10.59188/jurnalsosains.v5i1.31973
- By:
- Publication type:
- Article
Project Planning Analysis with the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT): Study on the Development of Facilities and Infrastructure of SMK Negeri 1 Garut (DOOM).
- Published in:
- Jurnal Indonesia Sosial Teknologi, 2025, v. 6, n. 1, p. 416, doi. 10.59141/jist.v6i1.8884
- By:
- Publication type:
- Article
Using PERT for New-Product Production.
- Published in:
- Management Review, 1966, v. 55, n. 6, p. 67
- Publication type:
- Article
PERT/COST: Its Values and Limitations.
- Published in:
- Management Review, 1966, v. 55, n. 3, p. 66
- By:
- Publication type:
- Article
The Application of Network Techniques (PERT/CPM) to the Planning and Control of an Audit.
- Published in:
- Journal of Accounting Research (Wiley-Blackwell), 1963, v. 1, n. 1, p. 96, doi. 10.2307/2489846
- By:
- Publication type:
- Article
Using PERT And Simulation To Set Promise Dates.
- Published in:
- Industrial Management, 1989, v. 31, n. 1, p. 14
- By:
- Publication type:
- Article
PERT/CPM: A Tool for Managing Projects.
- Published in:
- Industrial Management, 1985, v. 27, n. 1, p. 22
- By:
- Publication type:
- Article
The Determination of Times of Transhipment Processes at Maritime Container Terminals.
- Published in:
- TransNav: International Journal on Marine Navigation & Safety of Sea Transportation, 2022, v. 16, n. 3, p. 507, doi. 10.12716/1001.16.03.13
- By:
- Publication type:
- Article
Riziková analýza stochastického grafu PERT.
- Published in:
- Trends: Economics & Management / Trendy: Ekonomiky a Managementu, 2013, v. 7, n. 14, p. 35
- By:
- Publication type:
- Article
Preprocessing Stochastic Shortest-Path Problems with Application to PERT Activity Networks.
- Published in:
- INFORMS Journal on Computing, 2011, v. 23, n. 3, p. 460, doi. 10.1287/ijoc.1100.0411
- By:
- Publication type:
- Article
İş SÜREÇLERİNİN MODELLENMESİNDE GERT şEBEKELERİNİN KULLANIMI.
- Published in:
- Journal of Aeronautics & Space Technologies / Havacilik ve Uzay Teknolojileri Dergisi, 2010, v. 4, n. 3, p. 19
- By:
- Publication type:
- Article
Monitoring and Evaluation Practices on Building Construction Project Delivery among Tertiary Institutions of Ondo State, Nigeria.
- Published in:
- Journal of Applied Sciences & Environmental Management, 2024, v. 28, n. 12, p. 4007, doi. 10.4314/jasem.v28i12.8
- By:
- Publication type:
- Article
CPM--AN INTRODUCTION AND APPLICATION.
- Published in:
- SAM Advanced Management Journal (00360805), 1969, v. 34, n. 4, p. 83
- By:
- Publication type:
- Article
ADVANCED NETWORK TECHNIQUES.
- Published in:
- SAM Advanced Management Journal (00360805), 1969, v. 34, n. 4, p. 77
- By:
- Publication type:
- Article
Do You Want a Performance Audit or a Program Evaluation?
- Published in:
- Public Administration Review, 1990, v. 50, n. 1, doi. 10.2307/977292
- By:
- Publication type:
- Article
Improved moment-estimation formulas using more than three subjective fractiles.
- Published in:
- Management Science, 1998, v. 44, n. 3, p. 346, doi. 10.1287/mnsc.44.3.346
- By:
- Publication type:
- Article
Effects of Setup and Processing Time Reductions on WIP in the JIT Production Systems.
- Published in:
- Management Science, 1995, v. 41, n. 7, p. 1263, doi. 10.1287/mnsc.41.7.1263
- By:
- Publication type:
- Article
Better Estimation of PERT Activity Time Parameters.
- Published in:
- Management Science, 1993, v. 39, n. 9, p. 1086, doi. 10.1287/mnsc.39.9.1086
- By:
- Publication type:
- Article
A BRANCH-AND-BOUND PROCEDURE FOR THE MULTIPLE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM.
- Published in:
- Management Science, 1992, v. 38, n. 12, p. 1803, doi. 10.1287/mnsc.38.12.1803
- By:
- Publication type:
- Article
AN INTEGRATED MODEL FOR JOB-SHOP PLANNING AND SCHEDULING.
- Published in:
- Management Science, 1992, v. 38, n. 8, p. 1201, doi. 10.1287/mnsc.38.8.1201
- By:
- Publication type:
- Article
MAINTAINING PROJECT NETWORKS IN AUTOMATED ARTIFICIAL INTELLIGENCE PLANNING.
- Published in:
- Management Science, 1989, v. 35, n. 10, p. 1192, doi. 10.1287/mnsc.35.10.1192
- By:
- Publication type:
- Article
A NOTE ON PERT ASSUMPTIONS.
- Published in:
- Management Science, 1987, v. 33, n. 10, p. 1360, doi. 10.1287/mnsc.33.10.1360
- By:
- Publication type:
- Article
AN ANSWER TO SASIENI'S QUESTION ON PERT TIMES.
- Published in:
- Management Science, 1987, v. 33, n. 10, p. 1357, doi. 10.1287/mnsc.33.10.1357
- By:
- Publication type:
- Article
A NOTE ON PERT TIMES.
- Published in:
- Management Science, 1986, v. 32, n. 12, p. 1652, doi. 10.1287/mnsc.32.12.1652
- By:
- Publication type:
- Article
APPROXIMATING THE CRITICALITY INDICES OF THE ACTIVITIES IN PERT NETWORKS.
- Published in:
- Management Science, 1985, v. 31, n. 2, p. 207, doi. 10.1287/mnsc.31.2.207
- By:
- Publication type:
- Article
THREE-POINT APPROXIMATIONS FOR CONTINUOUS RANDOM VARIABLES.
- Published in:
- Management Science, 1983, v. 29, n. 5, p. 595, doi. 10.1287/mnsc.29.5.595
- By:
- Publication type:
- Article
A NOTE ON "EFFICIENCY OF THE ANTITHETIC VARIATE METHOD FOR SIMULATING STOCHASTIC NETWORKS"
- Published in:
- Management Science, 1983, v. 29, n. 3, p. 381, doi. 10.1287/mnsc.29.3.381
- By:
- Publication type:
- Article
R & D PROJECT PLANNING WITH Q-GERT NETWORK MODELING AND SIMULATION.
- Published in:
- Management Science, 1980, v. 26, n. 1, p. 44, doi. 10.1287/mnsc.26.1.44
- By:
- Publication type:
- Article
AN EFFICIENT INTEGER PROGRAMMING ALGORITHM WITH NETWORK CUTS FOR SOLVING RESOURCE-CONSTRAINED SCHEDULING PROBLEMS.
- Published in:
- Management Science, 1978, v. 24, n. 11, p. 1163, doi. 10.1287/mnsc.24.11.1163
- By:
- Publication type:
- Article
DYNAMIC PROGRAMMING MODELS OF THE NONSERIAL CRITICAL PATH-COST PROBLEM.
- Published in:
- Management Science, 1977, v. 24, n. 2, p. 200, doi. 10.1287/mnsc.24.2.200
- By:
- Publication type:
- Article
Dynamically Discovering Likely Program Invariants to Support Program Evolution.
- Published in:
- IEEE Transactions on Software Engineering, 2001, v. 27, n. 2, p. 99, doi. 10.1109/32.908957
- By:
- Publication type:
- Article
PERT: New Planning Applications For Management.
- Published in:
- Industrial Management, 1976, v. 18, n. 6, p. 9
- By:
- Publication type:
- Article
A PERT-TYPE APPROACH FOR DEMAND AND COST FORECASTING.
- Published in:
- Industrial Management, 1974, v. 16, n. 9, p. 8
- By:
- Publication type:
- Article
The Application of: PRODUCTIVITY CRITERIA QUOTIENTS TO SCHEDULE DETERMINATIONS.
- Published in:
- Industrial Management, 1966, v. 8, n. 12, p. 2
- By:
- Publication type:
- Article
Do-It-Yourself CPM/PERT.
- Published in:
- Industrial Management, 1965, v. 7, n. 10, p. 12
- By:
- Publication type:
- Article
THE ABC's OF PERT.
- Published in:
- Industrial Management, 1965, v. 7, n. 1, p. 8
- By:
- Publication type:
- Article
THE APPLICATION OF SELECTED NETWORK METHODS FOR RELIABLE AND SAFE TRANSPORT BY SMALL COMMERCIAL VEHICLES.
- Published in:
- Management Systems in Production Engineering, 2016, v. 23, n. 3, p. 198, doi. 10.2478/mspe-09-03-2016
- By:
- Publication type:
- Article
New Approach to Developing Conceptual Cost Estimates for Highway Projects.
- Published in:
- Journal of Construction Engineering & Management, 2011, v. 137, n. 11, p. 942, doi. 10.1061/(ASCE)CO.1943-7862.0000355
- By:
- Publication type:
- Article
Distributed Research Project Scheduling Based on Multi-Agent Methods.
- Published in:
- Journal of Applied Computer Science & Mathematics, 2011, n. 10, p. 20
- By:
- Publication type:
- Article
METODOLOGIA PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) E CRITICAL PATH METHOD (CPM): UMA APLICAÇÃO NO SETOR DE SERVIÇOS.
- Published in:
- Revista de Administraçãao da UNIMEP, 2020, v. 18, n. 1, p. 71
- By:
- Publication type:
- Article
A VALUE FOR PERT PROBLEMS.
- Published in:
- International Game Theory Review, 2009, v. 11, n. 4, p. 419, doi. 10.1142/S0219198909002418
- By:
- Publication type:
- Article
The Program Evaluation and Review Technique (PERT) in the late Soviet Union: A Case of Circulating Management Techniques in the Planned Economy.
- Published in:
- Comparativ: Leipziger Beiträge zur Universalgeschichte und Vergleichenden Gesellschaftsforschung, 2023, v. 33, n. 5/6, p. 657, doi. 10.26014/j.comp.2023.05-06.05
- By:
- Publication type:
- Article
Health technology assessments as a mechanism for increased value for money: recommendations to the Global Fund.
- Published in:
- Globalization & Health, 2013, v. 9, n. 1, p. 1, doi. 10.1186/1744-8603-9-35
- By:
- Publication type:
- Article
Application of virtual manufacturing to predict scenarios and reduce physical and non-physical losses in construction.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2024, v. 132, n. 11/12, p. 5473, doi. 10.1007/s00170-024-13702-9
- By:
- Publication type:
- Article
An Applicable Heuristic for Scheduling Multi-mode Resource Constraint Projects Using PERT Technique in the Presence of Uncertain Duration of Activities.
- Published in:
- International Journal of Supply & Operations Management, 2018, v. 5, n. 4, p. 338
- By:
- Publication type:
- Article
ОЦЕНКА НА ПРОИЗВОДИТЕЛНОСТТА НА СОФТУЕРНИЯ ТРУД: PERT ПОДХОД ЗА ИЗЧИСЛЯВАНЕ.
- Published in:
- Management & Education / Upravlenie i Obrazovanie, 2024, v. 20, n. 2, p. 51
- By:
- Publication type:
- Article
Using a Communication Audit to Evaluate Organizational Communication.
- Published in:
- Evaluation Review, 2006, v. 30, n. 2, p. 171, doi. 10.1177/0193841X05278789
- By:
- Publication type:
- Article
Econometrics for Evaluations: An Introduction to Recent Developments.
- Published in:
- Economic Record, 2003, v. 79, n. 247, p. 491, doi. 10.1111/j.1475-4932.2003.00148.x
- By:
- Publication type:
- Article
Estimating the Duration of a Project Using PERT Technique.
- Published in:
- Ovidius University Annals, Series Economic Sciences, 2013, v. 13, n. 2, p. 388
- By:
- Publication type:
- Article
Some challenges to be faced when building capacity.
- Published in:
- Clinical Nursing Research, 1998, v. 7, n. 4, p. 331, doi. 10.1177/105477389800700401
- By:
- Publication type:
- Article