Works matching DE "MINE design %26 construction"


Results: 41
    1
    2
    3
    4
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14

    Two-side sealer operation.

    Published in:
    Journal of Mining Science, 2013, v. 49, n. 5, p. 757, doi. 10.1134/S1062739149050092
    By:
    • Lekontsev, Yu.;
    • Sazhin, P.;
    • Temiryaeva, O.;
    • Khoreshok, A.;
    • Ushakov, S.
    Publication type:
    Article
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    25
    26
    27
    28
    29
    30
    31
    32
    33
    34

    Proximity Detection Zones.

    Published in:
    Professional Safety, 2016, v. 61, n. 6, p. 72
    By:
    • Bissert, Peter T.;
    • Carr, Jacob L.;
    • DuCarme, Joseph P.
    Publication type:
    Article
    35
    36
    37
    38
    39
    40
    41