Works matching DE "MILITARY helicopter design %26 construction"
Results: 8
EADS NORTH AMERICA AWARDED $212 MILLION PRODUCTION CONTRACT FOR 39 UH-72A LAKOTA HELICOPTERS.
- Published in:
- Defence Review Asia, 2012, v. 6, n. 1, p. 7
- Publication type:
- Article
Valutazione della capacità di rientro alla base di un elicottero in presenza di danno balistico ad un albero di trasmissione della linea rotore di coda.
- Published in:
- Fracture & Structural Integrity, 2010, n. 11, p. 21, doi. 10.3221/igf-esis.11.03
- By:
- Publication type:
- Article
Maneuverability Assessment of a Compound Helicopter Configuration.
- Published in:
- Journal of the American Helicopter Society, 2016, v. 61, n. 1, p. 012008-1, doi. 10.4050/JAHS.61.012008
- By:
- Publication type:
- Article
POTENTIAL FOR GREATNESS: THE NH90 FLEET IS SHOWING ITS PROMISE.
- Published in:
- Asia-Pacific Defence Reporter, 2018, v. 44, n. 7, p. 34
- By:
- Publication type:
- Article
MERLIN MAGIC - HELICOPTERS HAVE A VITAL ASW ROLE.
- Published in:
- Asia-Pacific Defence Reporter, 2017, v. 43, n. 8, p. 72
- By:
- Publication type:
- Article
SOMEONE IN DEFENCE REALLY DOESN'T LIKE THE TIGER ARH.
- Published in:
- Asia-Pacific Defence Reporter, 2017, v. 43, n. 3, p. 36
- By:
- Publication type:
- Article
An asymmetric evaluation.
- Published in:
- Asia-Pacific Defence Reporter, 2010, v. 36, n. 10, p. 8
- By:
- Publication type:
- Article
Carried Away.
- Published in:
- 2015
- By:
- Publication type:
- Case Study