Works matching DE "JOB shops management"
Results: 79
Note: On Semi-Active Timetabling in Resource-Constrained Project Scheduling.
- Published in:
- Management Science, 1999, v. 45, n. 3, p. 452, doi. 10.1287/mnsc.45.3.452
- By:
- Publication type:
- Article
Optimality of the Symmetric Workload Allocation in a Single-Server Flow Line System.
- Published in:
- Management Science, 1999, v. 45, n. 3, p. 449, doi. 10.1287/mnsc.45.3.449
- By:
- Publication type:
- Article
A Practical Scheduling Method for Multiclass Production Systems with Setups.
- Published in:
- Management Science, 1999, v. 45, n. 1, p. 116, doi. 10.1287/mnsc.45.1.116
- By:
- Publication type:
- Article
Finding Optimal Material Release Times Using Simulation-Based Optimization.
- Published in:
- Management Science, 1999, v. 45, n. 1, p. 86, doi. 10.1287/mnsc.45.1.86
- By:
- Publication type:
- Article
ACLIPS: A Capacity and Lead Time Integrated Procedure for Scheduling.
- Published in:
- Management Science, 1998, v. 44, n. 11, p. 1548, doi. 10.1287/mnsc.44.11.1548
- By:
- Publication type:
- Article
Note. Satisfying Due Dates in Large Job Shops.
- Published in:
- Management Science, 1998, v. 44, n. 10, p. 1442, doi. 10.1287/mnsc.44.10.1442
- By:
- Publication type:
- Article
Guided Local Search with Shifting Bottleneck for Job Shop Scheduling.
- Published in:
- Management Science, 1998, v. 44, n. 2, p. 262, doi. 10.1287/mnsc.44.2.262
- By:
- Publication type:
- Article
The One-machine Problem with Delayed Precedence Constraints and Its Use in Job Shop Scheduling.
- Published in:
- Management Science, 1995, v. 41, n. 1, p. 94, doi. 10.1287/mnsc.41.1.94
- By:
- Publication type:
- Article
FOCUSED SCHEDULING IN PROPORTIONATE FLOWSHOPS.
- Published in:
- Management Science, 1985, v. 31, n. 7, p. 852, doi. 10.1287/mnsc.31.7.852
- By:
- Publication type:
- Article
A NOTE ON STOCHASTIC SHOP MODELS IN WHICH JOBS HAVE THE SAME PROCESSING REQUIREMENTS ON EACH MACHINE.
- Published in:
- Management Science, 1985, v. 31, n. 7, p. 840, doi. 10.1287/mnsc.31.7.840
- By:
- Publication type:
- Article
SCHEDULING THE GENERAL JOB-SHOP.
- Published in:
- Management Science, 1985, v. 31, n. 5, p. 594, doi. 10.1287/mnsc.31.5.594
- By:
- Publication type:
- Article
FORMULATION AND SOLUTION OF NONLINEAR INTEGER PRODUCTION PLANNING PROBLEMS FOR FLEXIBLE MANUFACTURING SYSTEMS.
- Published in:
- Management Science, 1983, v. 29, n. 3, p. 273, doi. 10.1287/mnsc.29.3.273
- By:
- Publication type:
- Article
HEURISTIC TECHNIQUES FOR SIMULTANEOUS SCHEDULING OF PRODUCTION AND DISTRIBUTION IN MULTI-ECHELON STRUCTURES: THEORY AND EMPIRICAL COMPARISONS.
- Published in:
- Management Science, 1981, v. 27, n. 3, p. 336, doi. 10.1287/mnsc.27.3.336
- By:
- Publication type:
- Article
A PERSPECTIVE ON THE USE OF CONTROL VARIABLES TO INCREASE THE EFFICIENCY OF MONTE CARLO SIMULATIONS.
- Published in:
- Management Science, 1981, v. 27, n. 3, p. 322, doi. 10.1287/mnsc.27.3.322
- By:
- Publication type:
- Article
PRODUCTION AND SALES PLANNING WITH LIMITED SHARED TOOLING AT THE KEY OPERATION.
- Published in:
- Management Science, 1981, v. 27, n. 3, p. 247, doi. 10.1287/mnsc.27.3.247
- By:
- Publication type:
- Article
THE LAGRANGIAN RELAXATION METHOD FOR SOLVING INTEGER PROGRAMMING PROBLEMS.
- Published in:
- Management Science, 1981, v. 27, n. 1, p. 1, doi. 10.1287/mnsc.27.1.1
- By:
- Publication type:
- Article
SCHEDULING JOBS SUBJECT TO NONHOMOGENEOUS POISSON SHOCKS.
- Published in:
- Management Science, 1980, v. 26, n. 12, p. 1250, doi. 10.1287/mnsc.26.12.1250
- By:
- Publication type:
- Article
PRIORITY UPDATE INTERVALS AND ANOMALIES IN DYNAMIC RATIO TYPE JOB SHOP SCHEDULING RULES.
- Published in:
- Management Science, 1980, v. 26, n. 12, p. 1227, doi. 10.1287/mnsc.26.12.1227
- By:
- Publication type:
- Article
A MULTIPLE TIME SERIES APPROACH TO MODELING THE MANUFACTURING JOB-SHOP AS A NETWORK OF QUEUES.
- Published in:
- Management Science, 1977, v. 24, n. 4, p. 456, doi. 10.1287/mnsc.24.4.456
- By:
- Publication type:
- Article
JOB-SHOP SCHEDULING BY IMPLICIT ENUMERATION.
- Published in:
- Management Science, 1977, v. 24, n. 4, p. 441, doi. 10.1287/mnsc.24.4.441
- By:
- Publication type:
- Article
The job-shop problem and immediate selection.
- Published in:
- Annals of Operations Research, 1994, v. 50, n. 1-4, p. 73, doi. 10.1007/BF02085636
- By:
- Publication type:
- Article
Dispatching algorithm for production programming of flexible job-shop systems in the smart factory industry.
- Published in:
- Annals of Operations Research, 2018, v. 264, n. 1/2, p. 409, doi. 10.1007/s10479-017-2678-x
- By:
- Publication type:
- Article
New developments in stochastic models of manufacturing and service operations.
- Published in:
- International Journal of Production Research, 2016, v. 54, n. 20, p. 6102, doi. 10.1080/00207543.2016.1220674
- By:
- Publication type:
- Article
Smart production scheduling with time-dependent and machine-dependent electricity cost by considering distributed energy resources and energy storage.
- Published in:
- International Journal of Production Research, 2014, v. 52, n. 13, p. 3922, doi. 10.1080/00207543.2013.860251
- By:
- Publication type:
- Article
A real-time scheduling method for the cluster tool with wafer transfer delay.
- Published in:
- International Journal of Production Research, 2014, v. 52, n. 4, p. 934, doi. 10.1080/00207543.2013.808774
- By:
- Publication type:
- Article
Workload control in unbalanced job shops.
- Published in:
- International Journal of Production Research, 2014, v. 52, n. 3, p. 679, doi. 10.1080/00207543.2013.827808
- By:
- Publication type:
- Article
Multi-period lot sizing and job shop scheduling with compressible process times for multilevel product structures.
- Published in:
- International Journal of Production Research, 2013, v. 51, n. 20, p. 6229, doi. 10.1080/00207543.2013.825743
- By:
- Publication type:
- Article
THE LESSONS OF FLOWSHOP SCHEDULING RESEARCH.
- Published in:
- Operations Research, 1992, v. 40, n. 1, p. 7, doi. 10.1287/opre.40.1.7
- By:
- Publication type:
- Article
A Data Mining Based Dispatching Rules Selection System for the Job Shop Scheduling Problem.
- Published in:
- Journal of Advanced Manufacturing Systems, 2019, v. 18, n. 1, p. 35, doi. 10.1142/S0219686719500021
- By:
- Publication type:
- Article
Pull control for job shop: holonic manufacturing system approach using multicriteria decision-making.
- Published in:
- Journal of Intelligent Manufacturing, 2012, v. 23, n. 1, p. 141, doi. 10.1007/s10845-009-0288-4
- By:
- Publication type:
- Article
Knowledge based and CP-driven approach applied to multi product small-size production flow.
- Published in:
- Control & Cybernetics, 2010, v. 39, n. 1, p. 68
- By:
- Publication type:
- Article
An Algorithm for the Job Shop Scheduling Problem based on Global Equilibrium Search Techniques.
- Published in:
- Computational Management Science, 2006, v. 3, n. 4, p. 331, doi. 10.1007/s10287-006-0023-y
- By:
- Publication type:
- Article
A constructive heuristic for the integrated scheduling of machines and multiple-load material handling equipment in job shops.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2010, v. 46, n. 9-12, p. 1239, doi. 10.1007/s00170-009-2176-7
- By:
- Publication type:
- Article
Bottleneck identification procedures for the job shop scheduling problem with applications to genetic algorithms.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2009, v. 42, n. 11/12, p. 1153, doi. 10.1007/s00170-008-1664-5
- By:
- Publication type:
- Article
ON THE POWER OF RANDOMIZATION FOR JOB SHOP SCHEDULING WITH κ-UNITS LENGTH TASKS.
- Published in:
- RAIRO - Theoretical Informatics & Applications, 2009, v. 43, n. 2, p. 189, doi. 10.1051/ita:2008024
- By:
- Publication type:
- Article
Un algoritmo genético para el problema de Job Shop Flexible.
- Published in:
- INGENIARE - Revista Chilena de Ingeniería, 2011, v. 19, n. 1, p. 53
- Publication type:
- Article
Push-Kanban – a kanban-based production control concept for job shops.
- Published in:
- Production Planning & Control, 2014, v. 25, n. 5, p. 401, doi. 10.1080/09537287.2012.701021
- By:
- Publication type:
- Article
Lot streaming multiple jobs with values exponentially deteriorating over time in a job-shop environment.
- Published in:
- International Journal of Production Research, 2013, v. 51, n. 1, p. 202, doi. 10.1080/00207543.2012.657255
- By:
- Publication type:
- Article
Two decompositions for the bicriteria job-shop scheduling problem with discretely controllable processing times.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 24, p. 7415, doi. 10.1080/00207543.2011.651169
- By:
- Publication type:
- Article
Improving the applicability of workload control (WLC): the influence of sequence-dependent set-up times on workload controlled job shops.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 22, p. 6419, doi. 10.1080/00207543.2011.648275
- By:
- Publication type:
- Article
Stochastic single machine scheduling with random common due date.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 13, p. 3560, doi. 10.1080/00207543.2012.671589
- By:
- Publication type:
- Article
Hybrid simulated annealing with memory: an evolution-based diversification approach.
- Published in:
- International Journal of Production Research, 2010, v. 48, n. 18, p. 5455, doi. 10.1080/00207540903055685
- By:
- Publication type:
- Article
A scatter search approach to sequence-dependent setup times job shop scheduling.
- Published in:
- International Journal of Production Research, 2009, v. 47, n. 18, p. 5217, doi. 10.1080/00207540701805646
- By:
- Publication type:
- Article
Using dispatching rules for job shop scheduling with due date-based objectives.
- Published in:
- International Journal of Production Research, 2007, v. 45, n. 14, p. 3245, doi. 10.1080/00207540600786715
- By:
- Publication type:
- Article
A comparison of cross-training policies in different job shops.
- Published in:
- International Journal of Production Research, 2007, v. 45, n. 6, p. 1279, doi. 10.1080/00207540600658039
- By:
- Publication type:
- Article
The Impact of Enterprise Resource Planning on Job Shop Manufacturing Supply Chain Management.
- Published in:
- IUP Journal of Supply Chain Management, 2018, v. 15, n. 3, p. 48
- By:
- Publication type:
- Article
SEQUENCING n JOBS ON m MACHINES TO MINIMISE MAXIMUM TARDINESS: A BRANCH-AND-BOUND SOLUTION.
- Published in:
- Management Science, 1977, v. 23, n. 9, p. 1016, doi. 10.1287/mnsc.23.9.1016
- By:
- Publication type:
- Article
A COMPARISON OF CAPACITY PLANNING TECHNIQUES IN A JOB SHOP CONTROL SYSTEM.
- Published in:
- Management Science, 1977, v. 23, n. 9, p. 1011, doi. 10.1287/mnsc.23.9.1011
- By:
- Publication type:
- Article
A METHODOLOGY FOR ASSIGNING MINIMUM COST DUE-DATES.
- Published in:
- Management Science, 1977, v. 23, n. 8, p. 872, doi. 10.1287/mnsc.23.8.872
- By:
- Publication type:
- Article
A TIME SERIES APPROACH TO QUEUING SYSTEMS WITH APPLICATIONS FOR MODELING JOB-SHOP IN-PROCESS INVENTORIES.
- Published in:
- Management Science, 1977, v. 23, n. 7, p. 745, doi. 10.1287/mnsc.23.7.745
- By:
- Publication type:
- Article