Works matching DE "FOSTER Wheeler Energy Corp."
Results: 3
ASPECTS CONSIDERED IN NEW CFB BOILER DESIGN FOR NARVA POWER PLANTS.
- Published in:
- Oil Shale, 2003, v. 20, p. 371, doi. 10.3176/oil.2003.3s.10
- By:
- Publication type:
- Article
Prospecting way out west.
- Published in:
- TCE: The Chemical Engineer, 2009, n. 820, p. 27
- By:
- Publication type:
- Article
The science of safety.
- Published in:
- TCE: The Chemical Engineer, 2007, n. 793, p. 55
- By:
- Publication type:
- Article