Works matching DE "FALSEWORK (Structural engineering)"


Results: 4
    1

    Building bridges using the balanced lift method.

    Published in:
    Structural Concrete, 2014, v. 15, n. 3, p. 281, doi. 10.1002/suco.201400024
    By:
    • Kollegger, Johann;
    • Foremniak, Sara;
    • Suza, Dominik;
    • Wimmer, David;
    • Gmainer, Susanne
    Publication type:
    Article
    2
    3
    4

    Risk analysis of bridge falsework cuplok systems.

    Published in:
    Structure & Infrastructure Engineering: Maintenance, Management, Life-Cycle Design & Performance, 2017, v. 13, n. 10, p. 1327, doi. 10.1080/15732479.2016.1265991
    By:
    • André, João;
    • Beale, Robert;
    • Baptista, António M.
    Publication type:
    Article