Found: 146
Select item for more details and to access through your institution.
An empirical project forecasting accuracy framework using project regularity.
- Published in:
- Annals of Operations Research, 2024, v. 337, n. 2, p. 501, doi. 10.1007/s10479-023-05269-7
- By:
- Publication type:
- Article
CURRENT STATE OF THE APPLICATION OF EVM IN THE CONSTRUCTION INDUSTRY.
- Published in:
- International Journal of Organizational Innovation, 2024, v. 16, n. 4, p. 160
- By:
- Publication type:
- Article
One Way to Understand Artificial Intelligence (AI).
- Published in:
- Armed Forces Comptroller, 2024, v. 69, n. 1, p. 58
- By:
- Publication type:
- Article
Leveraging Support Vector Machine for Predictive Analysis of Earned Value Performance Indicators in Iraq's Oil Projects.
- Published in:
- Mathematical Modelling of Engineering Problems, 2023, v. 10, n. 6, p. 2001, doi. 10.18280/mmep.100610
- By:
- Publication type:
- Article
A Guideline of Earned Value Method (EVM) Implementation as Decision Baseline on Acceleration Solutions for Construction Project Scheduling.
- Published in:
- Technium, 2023, v. 16, p. 447, doi. 10.47577/technium.v16i.10027
- By:
- Publication type:
- Article
An Integrated Exercise to Teach Earned Value Management.
- Published in:
- Journal of Higher Education Theory & Practice, 2023, v. 23, n. 13, p. 106, doi. 10.33423/jhetp.v23i13.6321
- By:
- Publication type:
- Article
Who has turned the project management lights on? A comparative analysis of transportation and information technology in US state governments.
- Published in:
- Public Budgeting & Finance, 2023, v. 43, n. 3, p. 21, doi. 10.1111/pbaf.12346
- By:
- Publication type:
- Article
Determining the Factors Influencing Construction Project Management Performance Improvement through Earned Value-Based Value Engineering Strategy: A Delphi-Based Survey.
- Published in:
- Buildings (2075-5309), 2023, v. 13, n. 8, p. 1964, doi. 10.3390/buildings13081964
- By:
- Publication type:
- Article
Artificial Neural Network Model to Predict Final Construction Contract Duration.
- Published in:
- Applied Sciences (2076-3417), 2023, v. 13, n. 14, p. 8078, doi. 10.3390/app13148078
- By:
- Publication type:
- Article
Grey Earned Duration Management: a New Schedule Monitoring Approach.
- Published in:
- International Review of Civil Engineering, 2023, v. 14, n. 4, p. 291, doi. 10.15866/irece.v14i4.20968
- By:
- Publication type:
- Article
Study of Effort Calculation and Estimation in Open Source Projects.
- Published in:
- International Journal of Reliability, Quality & Safety Engineering, 2023, v. 30, n. 3, p. 1, doi. 10.1142/S0218539323500110
- By:
- Publication type:
- Article
Comparison of the Stability and Accuracy of Deterministic Project Cost Prediction Methods in Earned Value Management.
- Published in:
- Buildings (2075-5309), 2023, v. 13, n. 5, p. 1206, doi. 10.3390/buildings13051206
- By:
- Publication type:
- Article
Assessments of the Application of Earned Value Management System for Construction Project Performance Measurement in Zanzibar.
- Published in:
- Tanzania Journal of Engineering & Technology, 2023, v. 42, n. 2, p. 238, doi. 10.52339/tjet.v42i2.851
- By:
- Publication type:
- Article
PLANNING FOR THE FUTURE OF EARNED VALUE MANAGEMENT.
- Published in:
- Defense Acquisition, 2023, v. 52, n. 2, p. 6
- By:
- Publication type:
- Article
IT'S TIME TO "REBOOT" EARNED VALUE MANAGEMENT.
- Published in:
- Defense Acquisition, 2023, v. 52, n. 2, p. 10
- By:
- Publication type:
- Article
Earned Value Management Agent-Based Simulation Model.
- Published in:
- Systems, 2023, v. 11, n. 2, p. 86, doi. 10.3390/systems11020086
- By:
- Publication type:
- Article
Estimating Construction Project Duration and Costs upon Completion Using Monte Carlo Simulations and Improved Earned Value Management.
- Published in:
- Buildings (2075-5309), 2022, v. 12, n. 12, p. 2173, doi. 10.3390/buildings12122173
- By:
- Publication type:
- Article
Evaluation of EVM/ES forecasting methods in hospital construction projects.
- Published in:
- Revista Ingeniería de Construcción, 2022, v. 37, n. 3, p. 405, doi. 10.7764/RIC.00043.21
- By:
- Publication type:
- Article
A Systematic Review of Earned Value Management Methods for Monitoring and Control of Project Schedule Performance: An AHP Approach.
- Published in:
- Sustainability (2071-1050), 2022, v. 14, n. 22, p. 15259, doi. 10.3390/su142215259
- By:
- Publication type:
- Article
Managing Performance for Capital Projects.
- Published in:
- State & Local Government Review, 2022, v. 54, n. 3, p. 221, doi. 10.1177/0160323X221079675
- By:
- Publication type:
- Article
Novel Quality-Embedded Earned Value Performance Analysis Tool for Sustainable Project Portfolio Production.
- Published in:
- Sustainability (2071-1050), 2022, v. 14, n. 13, p. 8174, doi. 10.3390/su14138174
- By:
- Publication type:
- Article
Cost Early-Warning Model System of Large-Scale Construction Project.
- Published in:
- Computational Intelligence & Neuroscience, 2022, p. 1, doi. 10.1155/2022/3541803
- By:
- Publication type:
- Article
The Impact of Organisational Values on the Commercialisation of NGOs: Evidence Based on the Management by Values Theory.
- Published in:
- Acta Universitatis Lodziensis. Folia Oeconomica, 2022, v. 3, n. 360, p. 38, doi. 10.18778/0208-6018.360.03
- By:
- Publication type:
- Article
BETTER PROGRAM MANAGEMENT THROUGH DIGITAL ENGINEERING.
- Published in:
- Defense Acquisition, 2022, v. 51, n. 3, p. 30
- By:
- Publication type:
- Article
A SCIENTOMETRIC ANALYSIS OF PROJECT MONITORING LITERATURE.
- Published in:
- Journal of Economic Research & Business Administration, 2022, v. 140, n. 2, p. 89, doi. 10.26577/be.2022.v140.i2.09
- By:
- Publication type:
- Article
Earned Value Method (EVM) for Construction Projects: Current Application and Future Projections.
- Published in:
- Buildings (2075-5309), 2022, v. 12, n. 3, p. 301, doi. 10.3390/buildings12030301
- By:
- Publication type:
- Article
Integrated EDM and 4D BIM-Based Decision Support System for Construction Projects Control.
- Published in:
- Buildings (2075-5309), 2022, v. 12, n. 3, p. 315, doi. 10.3390/buildings12030315
- By:
- Publication type:
- Article
Improving estimate at completion (EAC) cost of construction projects using adaptive neuro-fuzzy inference system (ANFIS).
- Published in:
- Canadian Journal of Civil Engineering, 2022, v. 49, n. 2, p. 222, doi. 10.1139/cjce-2020-0399
- By:
- Publication type:
- Article
AN EARNED-VALUE-ANALYSIS (EVA)-BASED PROJECT CONTROL FRAMEWORK IN LARGE-SCALE SCAFFOLDING PROJECTS USING LINEAR REGRESSION MODELING.
- Published in:
- Journal of Information Technology in Construction, 2022, v. 27, p. 630, doi. 10.36680/j.itcon.2022.031
- By:
- Publication type:
- Article
Latent Errors and Visible Earned Value: How the Evolutionary Model Integrates Earned Value Metrics with Project System Dynamics.
- Published in:
- Systems, 2021, v. 9, n. 4, p. 88, doi. 10.3390/systems9040088
- By:
- Publication type:
- Article
Earned duration management under uncertainty.
- Published in:
- Soft Computing - A Fusion of Foundations, Methodologies & Applications, 2021, v. 25, n. 14, p. 8921, doi. 10.1007/s00500-021-05782-6
- By:
- Publication type:
- Article
Assessments of Barriers to Implementing Cost Control and Optimal Cost Reduction Techniques in Construction Projects: A Case Study of Egypt.
- Published in:
- Journal of Engineering Sciences, 2021, v. 49, n. 4, p. 509
- By:
- Publication type:
- Article
Earned Value Management of a Villa Construction project using Primavera P6.
- Published in:
- Turkish Online Journal of Qualitative Inquiry, 2021, v. 12, n. 6, p. 335
- By:
- Publication type:
- Article
Sustainability in the Aerospace Sector, a Transition to Clean Energy: The E 2 -EVM Valuation Model.
- Published in:
- Sustainability (2071-1050), 2021, v. 13, n. 12, p. 6717, doi. 10.3390/su13126717
- By:
- Publication type:
- Article
The Enhanced-Earned Value Management (E-EVM) Model: A Proposal for the Aerospace Industry.
- Published in:
- Symmetry (20738994), 2021, v. 13, n. 2, p. 232, doi. 10.3390/sym13020232
- By:
- Publication type:
- Article
2021 EDWARD HIRSCH ACQUISITION AND WRITING COMPETITION.
- Published in:
- Defense Acquisition Research Journal: A Publication of the Defense Acquisition University, 2021, v. 28, n. 1, p. 108
- Publication type:
- Article
Application of Hybrid SWARA–BIM in Reducing Reworks of Building Construction Projects from the Perspective of Time.
- Published in:
- Sustainability (2071-1050), 2020, v. 12, n. 21, p. 8927, doi. 10.3390/su12218927
- By:
- Publication type:
- Article
Improving the Results of the Earned Value Management Technique Using Artificial Neural Networks in Construction Projects.
- Published in:
- Symmetry (20738994), 2020, v. 12, n. 10, p. 1745, doi. 10.3390/sym12101745
- By:
- Publication type:
- Article
Integrating Risk into Project Control Using Bayesian Networks.
- Published in:
- International Journal of Information Technology & Decision Making, 2020, v. 19, n. 05, p. 1327, doi. 10.1142/S0219622020500315
- By:
- Publication type:
- Article
EARNED VALUE IN A PROJECT MANUFACTURING ENVIRONMENT: A CASE STUDY ASSESSING THE EFFECTIVENESS OF EVM.
- Published in:
- Journal of Modern Project Management, 2020, v. 08, n. 2, p. 58
- By:
- Publication type:
- Article
INTERPRETIVE STRUCTURAL MODELING IN EARNED VALUE MANAGEMENT.
- Published in:
- Journal of Civil Engineering & Management, 2020, v. 26, n. 6, p. 524, doi. 10.3846/jcem.2020.12182
- By:
- Publication type:
- Article
Predicting Earned Value Indexes in Residential Complexes' Construction Projects Using Artificial Neural Network Model.
- Published in:
- International Journal of Intelligent Engineering & Systems, 2020, v. 13, n. 4, p. 248, doi. 10.22266/ijies2020.0831.22
- By:
- Publication type:
- Article
Practices and Future of Earned Value Management: Insights from Turkey.
- Published in:
- Journal of Yaşar University / Yaşar Üniversitesi E-Dergisi, 2020, v. 15, n. 59, p. 426
- By:
- Publication type:
- Article
CRITICAL FACTORS AND BENEFITS IN THE USE OF EARNED VALUE MANAGEMENT IN CONSTRUCTION.
- Published in:
- Brazilian Journal of Operations & Production Management, 2020, v. 17, n. 1, p. 1, doi. 10.14488/BJOPM.2020.007
- By:
- Publication type:
- Article
A NEW DECISION SUPPORT SYSTEM AT ESTIMATION OF PROJECT COMPLETION TIME CONSIDERING THE COMBINATION OF ARTIFICIAL INTELLIGENCE METHODS BASED ON EARN VALUE MANAGEMENT FRAMEWORK.
- Published in:
- International Journal of Industrial Engineering, 2020, v. 27, n. 1, p. 1
- By:
- Publication type:
- Article
An Investigation into the Use of Laney U Chart as a Visual Schedule Tracker to Graphically Monitor the Schedule Performance Index.
- Published in:
- Journal of Engineering, Project & Production Management, 2020, v. 10, n. 1, p. 35, doi. 10.2478/jeppm-2020-0005
- By:
- Publication type:
- Article
Project monitoring by dynamic statistical control charts.
- Published in:
- Journal of Modern Project Management, 2019, v. 7, n. 3, p. 1, doi. 10.19255/JMPM02105
- By:
- Publication type:
- Article
EARNED VALUE ANALYSIS, IMPLEMENTATION BARRIERS, AND MATURITY LEVEL IN OIL & GAS PRODUCTION.
- Published in:
- South African Journal of Industrial Engineering, 2019, v. 30, n. 4, p. 44, doi. 10.7166/30-4-2030
- By:
- Publication type:
- Article
SAICE Training Calendar 2019.
- Published in:
- Journal of the South African Institution of Civil Engineering, 2019, v. 27, n. 9, p. 61
- Publication type:
- Article
A new interval type-2 fuzzy approach for analyzing and monitoring the performance of megaprojects based on earned value analysis (with a case study).
- Published in:
- Neural Computing & Applications, 2019, v. 31, n. 9, p. 5109, doi. 10.1007/s00521-018-04002-x
- By:
- Publication type:
- Article