Works matching DE "COMPUTER simulation of production scheduling"
Results: 38
A bi-objective parallel machine problem with eligibility, release dates and delivery times of the jobs.
- Published in:
- International Journal of Production Research, 2018, v. 56, n. 3, p. 1030, doi. 10.1080/00207543.2017.1351634
- By:
- Publication type:
- Article
>Biogeography-based optimisation for flexible manufacturing system scheduling problem.
- Published in:
- International Journal of Production Research, 2015, v. 53, n. 9, p. 2690, doi. 10.1080/00207543.2014.975855
- By:
- Publication type:
- Article
>Studying the effect of server side-constraints on the makespan of the no-wait flow-shop problem with sequence-dependent set-up times.
- Published in:
- International Journal of Production Research, 2015, v. 53, n. 9, p. 2652, doi. 10.1080/00207543.2014.974846
- By:
- Publication type:
- Article
>Integrating optimisation and simulation approaches for daily scheduling of assembly and test operations.
- Published in:
- International Journal of Production Research, 2015, v. 53, n. 9, p. 2617, doi. 10.1080/00207543.2014.970713
- By:
- Publication type:
- Article
ALGORÍTMO DE BÚSQUEDA DE ENTORNO VARIABLE PARA MINIMIZAR LA TARDANZA TOTAL PONDERADA EN UNA MÁQUINA DE PROCESAMIENTO POR LOTES.
- Published in:
- Revista Ingeniería Industrial, 2011, v. 10, n. 1, p. 5
- By:
- Publication type:
- Article
Research on Multi-objective Job Shop Scheduling with Dual Particle Swarm Algorithm Based on Greedy Strategy.
- Published in:
- Wireless Personal Communications, 2018, v. 103, n. 1, p. 255, doi. 10.1007/s11277-018-5440-z
- By:
- Publication type:
- Article
Problema de planificación estratégica de personal para cubrir una demanda de carga de trabajo temporal variable.
- Published in:
- DYNA - Ingeniería e Industria, 2015, v. 90, n. 2, p. 195, doi. 10.6036/7248
- By:
- Publication type:
- Article
Post simulation visualization model for effective scheduling of modular building construction.
- Published in:
- Canadian Journal of Civil Engineering, 2012, v. 39, n. 9, p. 1053, doi. 10.1139/l2012-077
- By:
- Publication type:
- Article
بهینه سازی کلونی مورچگان برای مسأله زمان بندی يکپارچۀ تولید و توزيع در زنجیرۀ تأمین: کمینه سازی مجموع وزنی تأخیر کارها و هزينۀ ارسال
- Published in:
- Production & Operations Management (2251-6409), 2017, v. 8, n. 2, p. 61
- By:
- Publication type:
- Article
Guest Editorial: Advances in Cloud Computing.
- Published in:
- International Journal for Computers & Their Applications, 2013, v. 20, n. 4, p. 193
- By:
- Publication type:
- Article
Scheduling TV commercials using genetic algorithms.
- Published in:
- International Journal of Production Research, 2013, v. 51, n. 16, p. 4921, doi. 10.1080/00207543.2013.778431
- By:
- Publication type:
- Article
Simulated annealing for improving the solution of the response time variability problem.
- Published in:
- International Journal of Production Research, 2013, v. 51, n. 16, p. 4911, doi. 10.1080/00207543.2013.775522
- By:
- Publication type:
- Article
Raw material release rates to ensure desired production lead time in Bernoulli serial lines.
- Published in:
- International Journal of Production Research, 2013, v. 51, n. 14, p. 4349, doi. 10.1080/00207543.2013.776191
- By:
- Publication type:
- Article
A tabu search algorithm with solution space partition and repairing procedure for cyclic robotic cell scheduling problem.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 22, p. 6403, doi. 10.1080/00207543.2011.645953
- By:
- Publication type:
- Article
Sequencing and scheduling in a three-machine robotic cell.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 10, p. 2823, doi. 10.1080/00207543.2011.596999
- By:
- Publication type:
- Article
Multi-objective flow-shop scheduling with parallel machines.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 10, p. 2796, doi. 10.1080/00207543.2011.593006
- By:
- Publication type:
- Article
Two enhanced differential evolution algorithms for job shop scheduling problems.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 10, p. 2757, doi. 10.1080/00207543.2011.588972
- By:
- Publication type:
- Article
Solving the spatial scheduling problem: a two-stage approach.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 10, p. 2732, doi. 10.1080/00207543.2011.588623
- By:
- Publication type:
- Article
Scheduling identical wafer sorting parallel machines with sequence-dependent setup times using an iterated greedy heuristic.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 10, p. 2710, doi. 10.1080/00207543.2011.588617
- By:
- Publication type:
- Article
A divide and conquer-based greedy search for two-machine no-wait job shop problems with makespan minimisation.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 10, p. 2692, doi. 10.1080/00207543.2011.582185
- By:
- Publication type:
- Article
A two-stage AIS approach for grid scheduling problems.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 10, p. 2665, doi. 10.1080/00207543.2011.578166
- By:
- Publication type:
- Article
Minimising total weighted earliness and tardiness on parallel machines using a hybrid heuristic.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 10, p. 2639, doi. 10.1080/00207543.2011.578163
- By:
- Publication type:
- Article
Multi-objective analysis of an integrated supply chain scheduling problem.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 10, p. 2624, doi. 10.1080/00207543.2011.578162
- By:
- Publication type:
- Article
Bi-criteria SDST hybrid flow shop scheduling with learning effect of setup times: water flow-like algorithm approach.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 10, p. 2609, doi. 10.1080/00207543.2010.546380
- By:
- Publication type:
- Article
Multi-objective no-wait flowshop scheduling problems: models and algorithms.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 10, p. 2592, doi. 10.1080/00207543.2010.543937
- By:
- Publication type:
- Article
Comparisons of bi-objective genetic algorithms for hybrid flowshop scheduling with sequence-dependent setup times.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 10, p. 2570, doi. 10.1080/00207543.2010.543178
- By:
- Publication type:
- Article
Swarm-based neighbourhood search algorithm for fuzzy flexible job shop scheduling.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 6, p. 1639, doi. 10.1080/00207543.2011.575412
- By:
- Publication type:
- Article
Hybrid flowshop scheduling with family setup time and inconsistent family formation.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 6, p. 1457, doi. 10.1080/00207543.2011.560620
- By:
- Publication type:
- Article
A hybrid approach for the capacitated lot sizing problem with setup carryover.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 6, p. 1582, doi. 10.1080/00207543.2011.559486
- By:
- Publication type:
- Article
Optimal composition of number and size of machines in a multi-stage make-to-order system with due dates.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 3, p. 603, doi. 10.1080/00207543.2010.543940
- By:
- Publication type:
- Article
A hybrid genetic algorithm for a loading problem in flexible manufacturing systems.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 3, p. 707, doi. 10.1080/00207543.2010.543935
- By:
- Publication type:
- Article
Petri nets and genetic algorithms for complex manufacturing systems scheduling.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 3, p. 791, doi. 10.1080/00207543.2010.543177
- By:
- Publication type:
- Article
A Petri net-based approach to incremental modelling of flow and resources in service-oriented manufacturing systems.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 2, p. 325, doi. 10.1080/00207543.2011.561371
- By:
- Publication type:
- Article
A CBFSA approach to resolve the distributed manufacturing process planning problem in a supply chain environment.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 2, p. 535, doi. 10.1080/00207543.2010.543176
- By:
- Publication type:
- Article
A two-layer dynamic scheduling method for minimising the earliness and tardiness of a re-entrant production line.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 2, p. 499, doi. 10.1080/00207543.2010.543171
- By:
- Publication type:
- Article
A hybrid computer simulation-artificial neural network algorithm for optimisation of dispatching rule selection in stochastic job shop scheduling problems.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 2, p. 551, doi. 10.1080/00207543.2010.539281
- By:
- Publication type:
- Article
Multi-agent job shop scheduling system based on co-operative approach of idle time minimisation.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 2, p. 409, doi. 10.1080/00207543.2010.539276
- By:
- Publication type:
- Article
The multi-resource agent bottleneck generalised assignment problem.
- Published in:
- International Journal of Production Research, 2012, v. 50, n. 2, p. 309, doi. 10.1080/00207543.2010.538745
- By:
- Publication type:
- Article