Works matching DE "CHANGE orders (Construction management)"
Results: 12
Auctions in the post-change-order period.
- Published in:
- Naval Research Logistics, 2015, v. 62, n. 3, p. 248, doi. 10.1002/nav.21626
- By:
- Publication type:
- Article
Change Orders and Lessons Learned: Knowledge from Statistical Analyses of Engineering Change Orders on Kentucky Highway Projects.
- Published in:
- Journal of Construction Engineering & Management, 2012, v. 138, n. 12, p. 1360, doi. 10.1061/(ASCE)CO.1943-7862.0000550
- By:
- Publication type:
- Article
Impact of Variation Orders on Time and Cost in Mega Hydropower Projects of Pakistan.
- Published in:
- Journal of Construction in Developing Countries, 2016, v. 21, n. 2, p. 37, doi. 10.21315/jcdc2016.21.2.3
- By:
- Publication type:
- Article
CONSTRUCTION CHANGE ORDER MANAGEMENT PROJECT SUPPORT SYSTEM UTILIZING DELPHI METHOD.
- Published in:
- Journal of Civil Engineering & Management, 2022, v. 28, n. 7, p. 564, doi. 10.3846/jcem.2022.17203
- By:
- Publication type:
- Article
A METHOD TO PREDICT CHANGE PROPAGATION WITHIN BUILDING INFORMATION MODEL.
- Published in:
- Journal of Civil Engineering & Management, 2017, v. 23, n. 6, p. 836, doi. 10.3846/13923730.2017.1323006
- By:
- Publication type:
- Article
Risk Factor Assessment Causing Contract Change Orders in the Double-Double Track Project.
- Published in:
- Journal Research of Social Science, Economics & Management, 2024, v. 4, p. 485, doi. 10.59141/jrssem.v4i4.739
- By:
- Publication type:
- Article
Effective Framework for Change Order Management Using Analytical Hierarchy Process (AHP).
- Published in:
- Gazi University Journal of Science, 2018, v. 31, n. 4, p. 1079
- By:
- Publication type:
- Article
Building Information Modelling Technology in Mitigating Cost Overruns and change orders in Construction Projects.
- Published in:
- Journal of Advanced Sciences & Engineering Technologies (JASET), 2021, v. 4, n. 1, p. 50, doi. 10.32441/jaset.04.01.05
- By:
- Publication type:
- Article
Engineering Change Orders Design Using Multiple Variables Linear Programming for VLSI Design.
- Published in:
- VLSI Design, 2014, p. 1, doi. 10.1155/2014/698041
- By:
- Publication type:
- Article
Optimizing Cash-Flow-at-Risk in Construction Projects: A Cost Reduction Approach.
- Published in:
- Periodica Polytechnica: Civil Engineering, 2016, v. 60, n. 3, p. 337, doi. 10.3311/PPci.7884
- By:
- Publication type:
- Article
The Influence of Non-Standard Work Breakdown Structure on Change Orders and Cost Estimation for Sudan Oil and Gas Projects.
- Published in:
- PM World Journal, 2016, v. 5, n. 12, p. 1
- By:
- Publication type:
- Article
Change Orders vs. Construction Change Directives: The Devil Is in the Details.
- Published in:
- Construction Lawyer, 2016, v. 36, n. 1, p. 34
- By:
- Publication type:
- Article