Works matching DE "BUILD operate transfer"
Results: 105
A framework for building quality into construction projects - Part II.
- Published in:
- Total Quality Management & Business Excellence, 2010, v. 21, n. 7, p. 725, doi. 10.1080/14783363.2010.483089
- By:
- Publication type:
- Article
LEGAL ASPECTS OF PPP CONTRACTS IN THE PROVISION OF DRINKING WATER IN GRESIK DISTRICT.
- Published in:
- Journal of Syntax Literate, 2021, v. 6, p. 986
- By:
- Publication type:
- Article
KAMU HİZMETİ İMTİYAZINDAN YAP İŞLET DEVRET YÖNTEMİNE: YASAL SERÜVEN.
- Published in:
- Journal of Turkish Court of Accounts / Sayistay Dergisi, 2013, n. 89, p. 91
- By:
- Publication type:
- Article
Regional Perspectives on China's Belt and Road Initiative: Challenges and Opportunities for the Asia-Pacific.
- Published in:
- Asian Politics & Policy, 2017, v. 9, n. 4, p. 646, doi. 10.1111/aspp.12346
- Publication type:
- Article
Estimating link travel time functions for heterogeneous traffic flows on freeways.
- Published in:
- Journal of Advanced Transportation, 2016, v. 50, n. 8, p. 1683, doi. 10.1002/atr.1423
- By:
- Publication type:
- Article
A real options based traffic risk mitigation model for build-operate-transfer highway projects in India.
- Published in:
- Construction Management & Economics, 2011, v. 29, n. 8, p. 771, doi. 10.1080/01446193.2011.597412
- By:
- Publication type:
- Article
Identifying the Pareto-front approximation for negotiations of BOT contracts with a multi-objective genetic algorithm.
- Published in:
- Construction Management & Economics, 2011, v. 29, n. 5, p. 535, doi. 10.1080/01446193.2011.564196
- By:
- Publication type:
- Article
Modelling completion risk using stochastic critical path-envelope method: a BOT highway project application.
- Published in:
- Construction Management & Economics, 2010, v. 28, n. 12, p. 1239, doi. 10.1080/01446193.2010.521755
- By:
- Publication type:
- Article
Valuation of multi-stage BOT projects involving dedicated asset investments: a sequential compound option approach.
- Published in:
- Construction Management & Economics, 2009, v. 27, n. 7, p. 653, doi. 10.1080/01446190903002789
- By:
- Publication type:
- Article
Variance models for project financial risk analysis with applications to greenfield BOT highway projects.
- Published in:
- Construction Management & Economics, 2008, v. 26, n. 9, p. 925, doi. 10.1080/01446190802259027
- By:
- Publication type:
- Article
Contract interpretation: the impact of readability.
- Published in:
- Construction Management & Economics, 2007, v. 25, n. 7, p. 729, doi. 10.1080/01446190601099228
- By:
- Publication type:
- Article
Modelling and assessment of critical risks in BOT road projects.
- Published in:
- Construction Management & Economics, 2006, v. 24, n. 4, p. 407, doi. 10.1080/01446190500435275
- By:
- Publication type:
- Article
Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects.
- Published in:
- Construction Management & Economics, 2006, v. 24, n. 4, p. 379, doi. 10.1080/01446190500434997
- By:
- Publication type:
- Article
An investigation of Chinese BOT projects in water supply: a comparative perspective.
- Published in:
- Construction Management & Economics, 2005, v. 23, n. 9, p. 913, doi. 10.1080/01446190500184121
- By:
- Publication type:
- Article
The financial risks in build‐operate‐transfer projects.
- Published in:
- Construction Management & Economics, 2005, v. 23, n. 4, p. 431, doi. 10.1080/01446190500041552
- By:
- Publication type:
- Article
The effect of concession period design on completion risk management of BOT projects.
- Published in:
- Construction Management & Economics, 2003, v. 21, n. 5, p. 471, doi. 10.1080/0144619032000073488
- By:
- Publication type:
- Article
Public Goods, Private Partnerships, and Political Institutions.
- Published in:
- Journal of Public Administration Research & Theory, 2019, v. 29, n. 1, p. 67, doi. 10.1093/jopart/muy036
- By:
- Publication type:
- Article
APPLICATIONS OF NEURAL NETWORK FOR RESOLUTION OF DISPUTE IN BUILD, OPERATE, AND TRANSFER (BOT) PROJECT: A REVIEW.
- Published in:
- i-Manager's Journal on Civil Engineering, 2017, v. 7, n. 2, p. 34, doi. 10.26634/jce.7.2.13426
- By:
- Publication type:
- Article
Modeling Contingent Liabilities Arising from Government Guarantees in Indonesian BOT/PPP Toll Roads.
- Published in:
- Journal of Construction Engineering & Management, 2012, v. 138, n. 12, p. 1403, doi. 10.1061/(ASCE)CO.1943-7862.0000555
- By:
- Publication type:
- Article
Public Financing into Build-Operate-Transfer Hospital Projects in Italy.
- Published in:
- Journal of Construction Engineering & Management, 2012, v. 138, n. 11, p. 1294, doi. 10.1061/(ASCE)CO.1943-7862.0000545
- By:
- Publication type:
- Article
Risk-Neutral Pricing Approach for Evaluating BOT Highway Projects with Government Minimum Revenue Guarantee Options.
- Published in:
- Journal of Construction Engineering & Management, 2012, v. 138, n. 4, p. 545, doi. 10.1061/(ASCE)CO.1943-7862.0000447
- By:
- Publication type:
- Article
Net Asset Value-Based Concession Duration Model for BOT Contracts.
- Published in:
- Journal of Construction Engineering & Management, 2012, v. 138, n. 2, p. 304, doi. 10.1061/(ASCE)CO.1943-7862.0000397
- By:
- Publication type:
- Article
Selecting BOT/PPP Infrastructure Projects for Government Guarantee Portfolio under Conditions of Budget and Risk in the Indonesian Context.
- Published in:
- Journal of Construction Engineering & Management, 2011, v. 137, n. 7, p. 512, doi. 10.1061/(ASCE)CO.1943-7862.0000312
- By:
- Publication type:
- Article
Sources of Changes in Design–Build Contracts for a Governmental Owner.
- Published in:
- Journal of Construction Engineering & Management, 2009, v. 135, n. 7, p. 588, doi. 10.1061/(ASCE)0733-9364(2009)135:7(588)
- By:
- Publication type:
- Article
Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods.
- Published in:
- Journal of Construction Engineering & Management, 2009, v. 135, n. 7, p. 579, doi. 10.1061/(ASCE)CO.1943-7862.0000017
- By:
- Publication type:
- Article
Automated Approach to Negotiations of BOT Contracts with the Consideration of Project Risk.
- Published in:
- Journal of Construction Engineering & Management, 2008, v. 134, n. 1, p. 18, doi. 10.1061/(ASCE)0733-9364(2008)134:1(18)
- By:
- Publication type:
- Article
CONSTRAINTS IN ADOPTION OF BUILD OPERATE AND TRANSFER (BOT) PROJECTS IN DEVELOPING COUNTRIES - FACT FINDINGS FROM PAKISTAN.
- Published in:
- Pakistan Journal of Science, 2012, v. 64, n. 3, p. 12
- By:
- Publication type:
- Article
News: Geomechanics and Tunnelling 2/2014.
- Published in:
- Geomechanik und Tunnelbau, 2014, v. 7, n. 2, p. 104, doi. 10.1002/geot.201490012
- Publication type:
- Article
Managing urban wastewater in China: a survey of build–operate–transfer contracts.
- Published in:
- Water & Environment Journal, 2009, v. 23, n. 1, p. 46, doi. 10.1111/j.1747-6593.2008.00108.x
- By:
- Publication type:
- Article
Crise et variables d'ajustement des États pétroliers méditerranéens.
- Published in:
- Revue Management et Avenir, 2010, n. 35, p. 95
- By:
- Publication type:
- Article
The Current Practices of Islamic Build Operate Transfer (BOT) Financing Contracts: A Legal Analysis.
- Published in:
- Pertanika Journal of Social Sciences & Humanities, 2012, v. 20, n. S, p. 73
- By:
- Publication type:
- Article
Globalization of the B.O.T System and Its Taxation Problems.
- Published in:
- Review of Business, 2003, v. 24, n. 2, p. 60
- By:
- Publication type:
- Article
Exploring Wireless Strain Measurement for Civil Infrastructure.
- Published in:
- Strain, 2009, v. 45, n. 6, p. 547, doi. 10.1111/j.1475-1305.2008.00518.x
- By:
- Publication type:
- Article
Public utilities and private initiative: The French concession model in historical perspective.
- Published in:
- Business History, 2011, v. 53, n. 5, p. 782, doi. 10.1080/00076791.2011.599590
- By:
- Publication type:
- Article
Determination of Concession Period in Build-Operate-Transfer Projects Using Fuzzy Logic.
- Published in:
- Iranian Journal of Management Studies, 2014, v. 7, n. 2, p. 437
- By:
- Publication type:
- Article
Ulaştırma Projeleri Finansmanı İçin Bir Model Önerisi: Kamu-Özel Sektör Ortaklığı İle Yap-İşlet-Devret.
- Published in:
- Journal of Business Research-Turk / Isletme Arastirmalari Dergisi, 2013, v. 5, n. 1, p. 116
- By:
- Publication type:
- Article
AN ANNUALIZED RATE OF RETURN-BASED CONCESSION DURATION MODEL FOR BOT CONTRACTS.
- Published in:
- International Journal of Construction Project Management, 2015, v. 7, n. 1, p. 45
- By:
- Publication type:
- Article
Critical Success Factors of Public-Private Partnership for Road Sector Development in India: A Private Sector Perspective.
- Published in:
- IUP Journal of Business Strategy, 2018, v. 15, n. 4, p. 45
- By:
- Publication type:
- Article
BELEDİYE YATIRIMLARININ FİNANSMANINDA YAP-İŞLET-DEVRET ALTERNATİFİ: ANTALYA SARISU MESİRE ALANI ÖRNEĞİ.
- Published in:
- Suleyman Demirel University Journal of Faculty of Economics & Administrative Sciences, 2010, v. 15, n. 3, p. 471
- By:
- Publication type:
- Article
عقد البناء والتشغيل ونقل الملكية لB.O.T وتطبيقاته في النظام القانوني الأردني.
- Published in:
- Dirasat: Shar'ia & Law Sciences, 2013, v. 40, p. 1050
- By:
- Publication type:
- Article
On a Synergistic Operating Mechanism for China’s Intellectual Property Public Policy System: A Study of China’s Technology Transfer Policy System.
- Published in:
- Social Sciences in China, 2013, v. 34, n. 1, p. 179, doi. 10.1080/02529203.2013.760726
- By:
- Publication type:
- Article
Overturning the Supreme Court: Treating Foreign International Arbitral Awards as Exceptions to the Rule on Finality of Judgments.
- Published in:
- Ateneo Law Journal, 2011, v. 55, n. 4, p. 882
- By:
- Publication type:
- Article
An Organizational Theory of International Technology Transfer.
- Published in:
- Minnesota Law Review, 2023, v. 108, n. 1, p. 71
- By:
- Publication type:
- Article
A circular and dynamic model of the process of job design.
- Published in:
- Journal of Occupational & Organizational Psychology, 2007, v. 80, n. 2, p. 321, doi. 10.1348/096317906X113211
- By:
- Publication type:
- Article
Factors That Influence the Concession Period Length for Tunnel Projects under BOT Contracts.
- Published in:
- Journal of Management in Engineering, 2014, v. 30, n. 1, p. 108, doi. 10.1061/(ASCE)ME.1943-5479.0000180
- By:
- Publication type:
- Article
Optimization of Bid-Winning Potential and Capital Structure for Build-Operate-Transfer Road Projects in India.
- Published in:
- Journal of Management in Engineering, 2012, v. 28, n. 2, p. 104, doi. 10.1061/(ASCE)ME.1943-5479.0000071
- By:
- Publication type:
- Article
Critical Success Factors for Transfer-Operate-Transfer Urban Water Supply Projects in China.
- Published in:
- Journal of Management in Engineering, 2011, v. 27, n. 4, p. 243, doi. 10.1061/(ASCE)ME.1943-5479.0000058
- By:
- Publication type:
- Article
Prototype Model for Build-Operate-Transfer Risk Assessment.
- Published in:
- Journal of Management in Engineering, 2002, v. 18, n. 1, p. 7, doi. 10.1061/(ASCE)0742-597X(2002)18:1(7)
- By:
- Publication type:
- Article
A Guide to Improving Construction Contracts.
- Published in:
- Arbitration Journal, 1986, v. 41, n. 2, p. 21
- By:
- Publication type:
- Article
Becoming an engineer in industrialising Great Britain circa 1760–1820.
- Published in:
- Engineering Studies, 2011, v. 3, n. 3, p. 215, doi. 10.1080/19378629.2011.618187
- By:
- Publication type:
- Article