Works matching DE "BRIDGE design %26 construction estimates"
Results: 2
Revised Case-Based Reasoning Model Development Based on Multiple Regression Analysis for Railroad Bridge Construction.
- Published in:
- Journal of Construction Engineering & Management, 2012, v. 138, n. 1, p. 154, doi. 10.1061/(ASCE)CO.1943-7862.0000393
- By:
- Publication type:
- Article
Inclusion of environmental impacts in life-cycle cost analysis of bridge structures.
- Published in:
- Sustainable & Resilient Infrastructure, 2020, v. 5, n. 4, p. 252, doi. 10.1080/23789689.2018.1542212
- By:
- Publication type:
- Article