Works matching DE "BRANCH %26 bound algorithms"
Results: 738
Finding a short and accurate decision rule in disjunctive normal form by exhaustive search.
- Published in:
- Machine Learning, 2010, v. 80, n. 1, p. 33, doi. 10.1007/s10994-010-5168-9
- By:
- Publication type:
- Article
gBoost: a mathematical programming approach to graph classification and regression.
- Published in:
- Machine Learning, 2009, v. 75, n. 1, p. 69, doi. 10.1007/s10994-008-5089-z
- By:
- Publication type:
- Article
Optimizing the number of multigrid cycles in the full multigrid algorithm.
- Published in:
- Numerical Linear Algebra with Applications, 2010, v. 17, n. 2/3, p. 199, doi. 10.1002/nla.697
- By:
- Publication type:
- Article
Makespan minimization for m-machine permutation flowshop scheduling problem with learning considerations.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2011, v. 56, n. 1-4, p. 355, doi. 10.1007/s00170-011-3172-2
- By:
- Publication type:
- Article
Branch-and-bound and simulated annealing algorithms for a total weighted completion time scheduling with ready times and learning effect.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2011, v. 55, n. 1-4, p. 341, doi. 10.1007/s00170-010-3022-7
- By:
- Publication type:
- Article
Product cooperative disassembly sequence planning based on branch-and-bound algorithm.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2010, v. 51, n. 9-12, p. 1139, doi. 10.1007/s00170-010-2682-7
- By:
- Publication type:
- Article
Single-machine-based production scheduling model integrated preventive maintenance planning.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2010, v. 50, n. 1-4, p. 365, doi. 10.1007/s00170-009-2514-9
- By:
- Publication type:
- Article
A parallel complete anytime procedure for project scheduling under multiple resource constraints.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2010, v. 50, n. 1-4, p. 353, doi. 10.1007/s00170-009-2483-z
- By:
- Publication type:
- Article
Algorithms for the single machine total weighted completion time scheduling problem with release times and sequence-dependent setups.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2009, v. 43, n. 7/8, p. 810, doi. 10.1007/s00170-008-1762-4
- By:
- Publication type:
- Article
A branch-and-bound parallel algorithm for single-machine total weighted tardiness problem.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2008, v. 37, n. 9-10, p. 996, doi. 10.1007/s00170-007-1023-y
- By:
- Publication type:
- Article
Branch-and-bound algorithms for simple assembly line balancing problem.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2008, v. 36, n. 1/2, p. 169, doi. 10.1007/s00170-006-0821-y
- By:
- Publication type:
- Article
A two-machine flowshop maximum tardiness scheduling problem with a learning effect.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2006, v. 31, n. 7/8, p. 743, doi. 10.1007/s00170-005-0255-y
- By:
- Publication type:
- Article
A Combinatorial Characterization of Higher-Dimensional Orthogonal Packing.
- Published in:
- Mathematics of Operations Research, 2004, v. 29, n. 2, p. 353, doi. 10.1287/moor.1030.0079
- By:
- Publication type:
- Article
DOMAIN CONTRACTION IN NONLINEAR PROGRAMMING: MINIMIZING A QUADRATIC CONCAVE OBJECTIVE OVER A POLYHEDRON.
- Published in:
- Mathematics of Operations Research, 1991, v. 16, n. 2, p. 390, doi. 10.1287/moor.16.2.390
- By:
- Publication type:
- Article
COMPUTATIONAL EFFICIENCY OF APPROXIMATE BRANCH-AND-BOUND ALGORITHMS.
- Published in:
- Mathematics of Operations Research, 1976, v. 1, n. 3, p. 287, doi. 10.1287/moor.1.3.287
- By:
- Publication type:
- Article
EUREKA: A HYBRID SYSTEM FOR ASSEMBLY LINE BALANCING.
- Published in:
- Management Science, 1992, v. 38, n. 1, p. 39, doi. 10.1287/mnsc.38.1.39
- By:
- Publication type:
- Article
ALGORITHMS FOR THE MULTI-RESOURCE GENERALIZED ASSIGNMENT PROBLEM.
- Published in:
- Management Science, 1991, v. 37, n. 6, p. 695, doi. 10.1287/mnsc.37.6.695
- By:
- Publication type:
- Article
A BRANCH-AND-BOUND METHOD FOR THE FIXED CHARGE TRANSPORTATION PROBLEM.
- Published in:
- Management Science, 1990, v. 36, n. 9, p. 1092, doi. 10.1287/mnsc.36.9.1092
- By:
- Publication type:
- Article
OPTIMAL SOLUTION OF SET COVERING/PARTITIONING PROBLEMS USING DUAL HEURISTICS.
- Published in:
- Management Science, 1990, v. 36, n. 6, p. 674, doi. 10.1287/mnsc.36.6.674
- By:
- Publication type:
- Article
ECONOMIC LOT SCHEDULING FOR MULTIPLE PRODUCTS ON PARALLEL IDENTICAL PROCESSORS.
- Published in:
- Management Science, 1990, v. 36, n. 3, p. 348, doi. 10.1287/mnsc.36.3.348
- By:
- Publication type:
- Article
PREFERENCE STRUCTURE REPRESENTATION USING CONVEX CONES IN MULTICRITERIA INTEGER PROGRAMMING.
- Published in:
- Management Science, 1989, v. 35, n. 9, p. 1092, doi. 10.1287/mnsc.35.9.1092
- By:
- Publication type:
- Article
GENERALIZED ASSIGNMENT WITH NONLINEAR CAPACITY INTERACTION.
- Published in:
- Management Science, 1989, v. 35, n. 8, p. 923, doi. 10.1287/mnsc.35.8.923
- By:
- Publication type:
- Article
OPERATIONS SEQUENCING IN DISCRETE PARTS MANUFACTURING.
- Published in:
- Management Science, 1989, v. 35, n. 2, p. 249, doi. 10.1287/mnsc.35.2.249
- By:
- Publication type:
- Article
AN ALGORITHM FOR SOLVING THE JOB-SHOP PROBLEM.
- Published in:
- Management Science, 1989, v. 35, n. 2, p. 164, doi. 10.1287/mnsc.35.2.164
- By:
- Publication type:
- Article
ALGORITHMS FOR SCHEDULING A SINGLE MACHINE TO MINIMIZE THE WEIGHTED NUMBER OF LATE JOBS.
- Published in:
- Management Science, 1988, v. 34, n. 7, p. 843, doi. 10.1287/mnsc.34.7.843
- By:
- Publication type:
- Article
A NEW ALGORITHM FOR THE 0-1 KNAPSACK PROBLEM.
- Published in:
- Management Science, 1988, v. 34, n. 5, p. 633, doi. 10.1287/mnsc.34.5.633
- By:
- Publication type:
- Article
A BRANCH-AND-BOUND APPROACH TO THE BICRITERION SCHEDULING PROBLEM INVOLVING TOTAL FLOWTIME AND RANGE OF LATENESS.
- Published in:
- Management Science, 1988, v. 34, n. 2, p. 254, doi. 10.1287/mnsc.34.2.254
- By:
- Publication type:
- Article
OPTIMALLY BALANCING LARGE ASSEMBLY LINES WITH 'FABLE'
- Published in:
- Management Science, 1988, v. 34, n. 2, p. 240, doi. 10.1287/mnsc.34.2.240
- By:
- Publication type:
- Article
AN INTEGER PROGRAMMING APPROACH AND IMPLEMENTATION FOR AN ELECTRONIC UTILITY CAPACITY PLANNING PROBLEM WITH RENEWABLE ENERGY SOURCES.
- Published in:
- Management Science, 1987, v. 33, n. 7, p. 831, doi. 10.1287/mnsc.33.7.831
- By:
- Publication type:
- Article
A BRANCH AND BOUND APPROACH FOR MACHINE LOAD BALANCING IN FLEXIBLE MANUFACTURING SYSTEMS.
- Published in:
- Management Science, 1986, v. 32, n. 10, p. 1316, doi. 10.1287/mnsc.32.10.1316
- By:
- Publication type:
- Article
A MULTIPLIER ADJUSTMENT METHOD FOR THE GENERALIZED ASSIGNMENT PROBLEM.
- Published in:
- Management Science, 1986, v. 32, n. 9, p. 1095, doi. 10.1287/mnsc.32.9.1095
- By:
- Publication type:
- Article
HEURISTICS FOR MULTILEVEL LOT-SIZING WITH A BOTTLENECK.
- Published in:
- Management Science, 1986, v. 32, n. 8, p. 989, doi. 10.1287/mnsc.32.8.989
- By:
- Publication type:
- Article
TRUE INTEREST COST IN MUNICIPAL BOND BIDDING: AN INTEGER PROGRAMMING APPROACH.
- Published in:
- Management Science, 1986, v. 32, n. 7, p. 870, doi. 10.1287/mnsc.32.7.870
- By:
- Publication type:
- Article
IMPROVED PENALTIES FOR FIXED COST LINEAR PROGRAMS USING LAGRANGEAN RELAXATION.
- Published in:
- Management Science, 1986, v. 32, n. 7, p. 856, doi. 10.1287/mnsc.32.7.856
- By:
- Publication type:
- Article
AN INTERACTIVE BRANCH-AND-BOUND ALGORITHM FOR MULTIPLE CRITERIA OPTIMIZATION.
- Published in:
- Management Science, 1986, v. 32, n. 1, p. 61, doi. 10.1287/mnsc.32.1.61
- By:
- Publication type:
- Article
BRANCH AND BOUND EXPERIMENTS IN CONVEX NONLINEAR INTEGER PROGRAMMING.
- Published in:
- Management Science, 1985, v. 31, n. 12, p. 1533, doi. 10.1287/mnsc.31.12.1533
- By:
- Publication type:
- Article
A LAGRANGEAN BASED BRANCH AND BOUND ALGORITHM FOR SINGLE MACHINE SEQUENCING WITH PRECEDENCE CONSTRAINTS TO MINIMIZE TOTAL WEIGHTED COMPLETION TIME.
- Published in:
- Management Science, 1985, v. 31, n. 10, p. 1300, doi. 10.1287/mnsc.31.10.1300
- By:
- Publication type:
- Article
FOCUSED SCHEDULING IN PROPORTIONATE FLOWSHOPS.
- Published in:
- Management Science, 1985, v. 31, n. 7, p. 852, doi. 10.1287/mnsc.31.7.852
- By:
- Publication type:
- Article
SCHEDULING THE GENERAL JOB-SHOP.
- Published in:
- Management Science, 1985, v. 31, n. 5, p. 594, doi. 10.1287/mnsc.31.5.594
- By:
- Publication type:
- Article
MULTI-ACTIVITY FACILITY DESIGN AND LOCATION PROBLEMS.
- Published in:
- Management Science, 1985, v. 31, n. 3, p. 275, doi. 10.1287/mnsc.31.3.275
- By:
- Publication type:
- Article
SCHOOL TIMETABLING--A CASE IN LARGE BINARY INTEGER LINEAR PROGRAMMING.
- Published in:
- Management Science, 1984, v. 30, n. 12, p. 1473, doi. 10.1287/mnsc.30.12.1473
- By:
- Publication type:
- Article
A MIXTURE OF DYNAMIC PROGRAMMING AND BRANCH-AND-BOUND FOR THE SUBSET-SUM PROBLEM.
- Published in:
- Management Science, 1984, v. 30, n. 6, p. 765, doi. 10.1287/mnsc.30.6.765
- By:
- Publication type:
- Article
ON THE SINGLE MACHINE SCHEDULING PROBLEM WITH QUADRATIC PENALTY FUNCTION OF COMPLETION TIMES: AN IMPROVED BRANCHING PROCEDURE.
- Published in:
- Management Science, 1984, v. 30, n. 5, p. 644, doi. 10.1287/mnsc.30.5.644
- By:
- Publication type:
- Article
A LOWER MULTINOMIAL BOUND FOR THE TOTAL OVERSTATEMENT ERROR IN ACCOUNTING POPULATIONS.
- Published in:
- Management Science, 1984, v. 30, n. 1, p. 37, doi. 10.1287/mnsc.30.1.37
- By:
- Publication type:
- Article
AN ALGORITHM FOR MULTIOBJECTIVE ZERO-ONE LINEAR PROGRAMMING.
- Published in:
- Management Science, 1983, v. 29, n. 12, p. 1444, doi. 10.1287/mnsc.29.12.1444
- By:
- Publication type:
- Article
A BRANCH AND BOUND ALGORITHM FOR ASSEMBLY LINE BALANCING PROBLEMS WITH FORMULATION IRREGULARITIES.
- Published in:
- Management Science, 1983, v. 29, n. 11, p. 1309, doi. 10.1287/mnsc.29.11.1309
- By:
- Publication type:
- Article
RESOURCE ALLOCATION TO INTERRELATED RISKY PROJECTS USING A MULTIATTRIBUTE UTILITY FUNCTION.
- Published in:
- Management Science, 1983, v. 29, n. 4, p. 430, doi. 10.1287/mnsc.29.4.430
- By:
- Publication type:
- Article
A DUAL-BASED PROCEDURE FOR DYNAMIC FACILITY LOCATION.
- Published in:
- Management Science, 1982, v. 28, n. 10, p. 1091, doi. 10.1287/mnsc.28.10.1091
- By:
- Publication type:
- Article
ON OPTIMAL ALLOCATION IN A DISTRIBUTED PROCESSING ENVIRONMENT.
- Published in:
- Management Science, 1982, v. 28, n. 8, p. 839, doi. 10.1287/mnsc.28.8.839
- By:
- Publication type:
- Article
A GREEDY HEURISTIC FOR SINGLE MACHINE SEQUENCING WITH PRECEDENCE CONSTRAINTS.
- Published in:
- Management Science, 1981, v. 27, n. 10, p. 1209, doi. 10.1287/mnsc.27.10.1209
- By:
- Publication type:
- Article