Found: 3
Select item for more details and to access through your institution.
Lot cycle time prediction in a ramping-up semiconductor manufacturing factory with a SOM–FBPN-ensemble approach with multiple buckets and partial normalization.
- Published in:
- International Journal of Advanced Manufacturing Technology, 2009, v. 42, n. 11/12, p. 1206, doi. 10.1007/s00170-008-1665-4
- By:
- Publication type:
- Article
A Selectively Fuzzified Back Propagation Network Approach for Precisely Estimating the Cycle Time Range in Wafer Fabrication.
- Published in:
- Mathematics (2227-7390), 2021, v. 9, n. 12, p. 1430, doi. 10.3390/math9121430
- By:
- Publication type:
- Article
Energy-Efficient Production Planning Using a Two-Stage Fuzzy Approach.
- Published in:
- Mathematics (2227-7390), 2021, v. 9, n. 10, p. 1101, doi. 10.3390/math9101101
- By:
- Publication type:
- Article