Found: 3
Select item for more details and to access through your institution.
A Memetic Algorithm to Minimize the Total Sum of Earliness Tardiness and Sequence Dependent Setup Costs for Flow Shop Scheduling Problems with Job Distinct Due Windows.
- Published in:
- Songklanakarin Journal of Science & Technology, 2018, v. 40, n. 5, p. 1203
- By:
- Publication type:
- Article
Determination of inventory replenishment policy with the open vehicle routing concept in a multi-depot and multi-retailer distribution system.
- Published in:
- Engineering & Applied Science Research, 2018, v. 45, n. 1, p. 23, doi. 10.14456/easr.2018.3
- By:
- Publication type:
- Article
Production Sequence Determination to Minimize the Required Storage Space for the Multiple Items Production System.
- Published in:
- Journal of Industrial Engineering & Management, 2022, v. 15, n. 3, p. 416, doi. 10.3926/jiem.3715
- By:
- Publication type:
- Article