Found: 4
Select item for more details and to access through your institution.
Automatic Management and Monitoring of Bridge Lifting: A Method of Changing Engineering in Real-Time.
- Published in:
- Sensors (14248220), 2019, v. 19, n. 23, p. 5293, doi. 10.3390/s19235293
- By:
- Publication type:
- Article
CAD of human resource configuration in project scheduling for construction engineering applications.
- Published in:
- Computer Applications in Engineering Education, 2018, v. 26, n. 5, p. 1255, doi. 10.1002/cae.21999
- By:
- Publication type:
- Article
Development of an empirical model for rainfall-induced hillside vulnerability assessment: a case study on Chen-Yu-Lan watershed, Nantou, Taiwan.
- Published in:
- Natural Hazards, 2014, v. 74, n. 2, p. 341, doi. 10.1007/s11069-014-1219-z
- By:
- Publication type:
- Article
Development of medium- and low-rise reinforced concrete building fragility curves based on Chi-Chi Earthquake data.
- Published in:
- Natural Hazards, 2013, v. 69, n. 1, p. 695, doi. 10.1007/s11069-013-0733-8
- By:
- Publication type:
- Article